A reminder device for bridge construction

A bridge construction and equipment technology, applied in the field of warning equipment, can solve the problems of poor warning effect, difficult to attract people's attention, complicated operation, etc.

Active Publication Date: 2019-11-19
安徽省元地测绘有限公司
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] In order to overcome the disadvantages of poor warning effect, difficult to attract people's attention and complicated operation of the existing reminder equipment for bridge construction, the technical problem to be solved by the present invention is to provide a kind of warning device with good warning effect, easy to attract people's attention and simple operation. Reminder devices for bridge construction

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A reminder device for bridge construction
  • A reminder device for bridge construction
  • A reminder device for bridge construction

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0030] A reminder device for bridge construction, such as Figure 1-4 As shown, it includes a base plate 1, a vertical plate 2, a first pole 3, a warning sign 4, a driving mechanism 5 and a reminder mechanism 6. The left and right sides of the top of the bottom plate 1 are provided with vertical plates 2, and the right side of the right vertical plate 2 A warning sign 4 is provided on the side, a drive mechanism 5 is provided in the middle of the top of the bottom plate 1, a first pole 3 is provided in the middle between the left and right vertical plates 2, and a reminder mechanism 6 is provided between the left and right first poles 3 .

Embodiment 2

[0032] A reminder device for bridge construction, such as Figure 1-4 As shown, it includes a base plate 1, a vertical plate 2, a first pole 3, a warning sign 4, a driving mechanism 5 and a reminder mechanism 6. The left and right sides of the top of the bottom plate 1 are provided with vertical plates 2, and the right side of the right vertical plate 2 A warning sign 4 is provided on the side, a drive mechanism 5 is provided in the middle of the top of the bottom plate 1, a first pole 3 is provided in the middle between the left and right vertical plates 2, and a reminder mechanism 6 is provided between the left and right first poles 3 .

[0033] Drive mechanism 5 comprises cylinder 51, double-sided wedge 52, second pole 53, guide sleeve 54, guide rod 55, contact wheel 56 and first spring 57, is provided with cylinder 51 in the middle of bottom plate 1 top, and cylinder 51 top is provided with Double-sided wedge 52 is arranged, and the left and right sides of reminding mecha...

Embodiment 3

[0035] A reminder device for bridge construction, such as Figure 1-4 As shown, it includes a base plate 1, a vertical plate 2, a first pole 3, a warning sign 4, a driving mechanism 5 and a reminder mechanism 6. The left and right sides of the top of the bottom plate 1 are provided with vertical plates 2, and the right side of the right vertical plate 2 A warning sign 4 is provided on the side, a drive mechanism 5 is provided in the middle of the top of the bottom plate 1, a first pole 3 is provided in the middle between the left and right vertical plates 2, and a reminder mechanism 6 is provided between the left and right first poles 3 .

[0036]Drive mechanism 5 comprises cylinder 51, double-sided wedge 52, second pole 53, guide sleeve 54, guide rod 55, contact wheel 56 and first spring 57, is provided with cylinder 51 in the middle of bottom plate 1 top, and cylinder 51 top is provided with Double-sided wedge 52 is arranged, and the left and right sides of reminding mechan...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to reminding equipment, in particular to reminding equipment for bridge construction. The reminding equipment for bridge construction comprises a bottom plate and the like and ischaracterized in that vertical plates are arranged on the left and right sides of the top of the bottom plate, a warning board is arranged on the right of the right vertical plate, a drive mechanismis arranged in the middle of the top of the bottom plate, first support rods are arranged in the middles of the opposite sides of the left vertical plate and right vertical plate, and a reminding mechanism is arranged between the left first support rod and the right first support rod. The reminding equipment for bridge construction has the advantages that the drive mechanism works to drive the reminding mechanism to remind people so as to prevent accidents and allow the people to notice the announcement on the warning board, an air injection mechanism and an indicating mechanism can further catch the attention of the people, and the reminding equipment is good in warning effect, capable of easily catching the attention of the people and simple to operate.

Description

technical field [0001] The invention relates to a reminder device, in particular to a reminder device for bridge construction. Background technique [0002] Bridge construction is the process of building a bridge according to the design content; it mainly refers to bridge construction technology and construction organization, construction management, construction quality, etc. In the construction process of road and bridge projects, construction quality problems often occur, and the quality problems in the project are variable. For those surface quality problems, it is necessary to further find out whether the nature of the problem will be transformed, and for those that may develop into component fracture and collapse. In the event of an accident, emergency remedial measures should be taken in time. When formulating emergency measures, the following items should generally be noted. [0003] When carrying out bridge construction, it is necessary to remind pedestrians to av...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): G09F7/22G09F27/00G09F13/02
CPCG09F7/22G09F13/02G09F27/00G09F2007/1873
Inventor 胡叙成徐卉吕佳兴
Owner 安徽省元地测绘有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products