Irrigation-free greening method for roads in desert area
A technology for highways and deserts, applied in the field of highway irrigation-free greening in desert areas, can solve the problems of high operating costs, high costs, and inability to guarantee water sources, and achieve the effect of huge promotion potential and increased maintenance costs.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0020] a. Laying of rainwater collection facilities: through road reconstruction, replace the common curbstones in the experimental area with curbstones 1, and use the improved curbstones 1 to collect rainwater. The thickness of curbstones 1 is 12cm, and the height is 30cm. The length is 50cm, and the top of the stone 1 along the catchment road is inclined to open a semi-arc groove 2, the outside of the stone 1 along the catchment road is higher than the inner side by 2-4cm, and the center bottom of the half-arc groove 2 is 1cm lower than the inner edge 3, Along both sides of the road 4, the inner side of the Yanshi 1 of the catchment road is laid close to the asphalt road surface, and irrigation branch canals 7 are set on both sides of the road 4. In order to reduce the impact of water collection and greening on the roadbed of the road 4, the green irrigation branch canal 7 is 6m away from the roadbed of the road 4 , parallel to the road 4 direction, between the irrigation bra...
Embodiment 2
[0025] a. Laying of rainwater collection facilities: through road reconstruction, replace the common curbstones in the experimental area with curbstones 1, and use the improved curbstones 1 to collect rainwater. The thickness of curbstones 1 is 12cm, and the height is 30cm. The length is 50cm, and the top of the stone 1 along the catchment road is inclined to open a semi-arc groove 2, the outside of the stone 1 along the catchment road is higher than the inner side by 2-4cm, and the center bottom of the half-arc groove 2 is 1cm lower than the inner edge 3, Along both sides of the road 4, the inner side of the Yanshi 1 of the catchment road is laid close to the asphalt road surface, and irrigation branch canals 7 are set on both sides of the road 4. In order to reduce the impact of water collection and greening on the roadbed of the road 4, the green irrigation branch canal 7 is 6m away from the roadbed of the road 4 , parallel to the road 4 direction, between the irrigation bra...
Embodiment 3
[0030] a. Laying of rainwater collection facilities: through road reconstruction, replace the common curbstones in the experimental area with curbstones 1, and use the improved curbstones 1 to collect rainwater. The thickness of curbstones 1 is 12cm, and the height is 30cm. The length is 50cm, and the top of the stone 1 along the catchment road is inclined to open a semi-arc groove 2, the outside of the stone 1 along the catchment road is higher than the inner side by 2-4cm, and the center bottom of the half-arc groove 2 is 1cm lower than the inner edge 3, Along both sides of the road 4, the inner side of the Yanshi 1 of the catchment road is laid close to the asphalt road surface, and irrigation branch canals 7 are set on both sides of the road 4. In order to reduce the impact of water collection and greening on the roadbed of the road 4, the green irrigation branch canal 7 is 6m away from the roadbed of the road 4 , parallel to the road 4 direction, between the irrigation bra...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com