Scheduling system and method

A scheduling and time schedule technology, applied in the field of scheduling systems, can solve problems such as affecting the process, yield and yield decline, and inability to meet factories.

Inactive Publication Date: 2018-06-05
INSTITUTE FOR INFORMATION INDUSTRY
View PDF7 Cites 9 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] In the past, capacity planning was mostly a static model, and planning and scheduling could be carried out after setting production and manufacturing related data through the production scheduling system. During continuous production, if a certain process equipment is abnormal, it will produce defective semi-finished products or reduce production efficiency, which will then affect the subsequent processes, resulting in a decline in yield and output.
[0004] In addition, most of the current scheduling systems or methods are aimed at increasing production and stabilizing delivery. However, different factories and production processes require different scheduling objectives. Therefore, the production goal can only be increased with increasing production and stabilizing delivery. Scheduling systems and methods have been unable to meet the needs of most factories

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Scheduling system and method
  • Scheduling system and method
  • Scheduling system and method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0030] In order to make the description of the present invention more detailed and complete, reference may be made to the attached drawings and various embodiments described below, and the same numbers in the drawings represent the same or similar elements. On the other hand, well-known elements and steps have not been described in the embodiments in order to avoid unnecessarily limiting the invention.

[0031] In the embodiments and claims, the description involving "electrical connection" may generally refer to an element being indirectly electrically coupled to another element through other elements, or an element being directly electrically connected without passing through other elements to another component.

[0032] In the embodiments and claims, "a" and "the" can generally refer to a single or a plurality, unless the article is specifically limited in the context.

[0033] figure 1 is a block diagram of a scheduling system 100 according to an embodiment of the presen...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The present disclosure provides a scheduling system and method. This method includes steps as follow. A communication device is connected to a plurality processing stations and receives instant process data of each processing station, where the instant process data includes a main program number and a processing time. According to target yield, delivery time and the instant process data of the processing stations, production line scheduling is calculated, and an estimated production is forecasted. It is determined that whether the actual production of the production line scheduling matches theestimated production. When the actual production is lower than the estimated production, based on the instant process data, a bottleneck station is determined from the processing stations. The machine diagnosis is performed on the bottleneck station to identify an abnormal cause. If facilities with a same function can replace the bottleneck station, a scheduling decision system selects a same facility as a processing station, if there is no facility with a same function, the scheduling system notifies related staff to maintain the bottleneck station, and the overall scheduling efficiency is improved.

Description

technical field [0001] The present invention relates to a computer system and method, and in particular to a scheduling system and method. Background technique [0002] Capacity planning is to provide a method to determine the size of the overall production capacity formed by the combination of capital-intensive resources, such as: equipment, tools, facilities and overall labor force size. [0003] In the past, capacity planning was mostly a static model, and planning and scheduling could be carried out after setting production and manufacturing related data through the production scheduling system. During continuous production and manufacturing, if a certain process equipment is abnormal, defective semi-finished products will be produced or production efficiency will be reduced, which will affect the subsequent processes, resulting in a decline in yield and output. [0004] In addition, most of the current scheduling systems or methods are aimed at increasing production an...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G05B19/418
CPCG05B19/41865G05B2219/32252G05B2219/32239G05B2219/32267Y02P90/02G05B2219/24018G05B2219/25419
Inventor 陈承辉高虹安邱宏昇张晓珍
Owner INSTITUTE FOR INFORMATION INDUSTRY