A technology of expansion agent and rock mass, which is applied in the field of new-type expansion anchorage, can solve the problems of spray body falling off, serious damage, high construction cost, etc., and achieve the effect of increasing the thickness of the protective layer, resisting the corrosion of steel bars, and saving engineering costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] refer to Figure 1-2 A device for reinforcing different fractured areas of deep rock mass by utilizing the expansion agent head expansion effect, which includes a deep rock mass 1, and there are different fractured rock mass areas 2 and intact rock mass areas 3 inside the deep rock mass 1; The inside of the broken rock mass area 2 and the complete rock mass area 3 are anchored with bolts 9, and the inside of the broken rock mass area 2 with different depths or layers where the anchor bars 9 are located is poured with expansive cement slurry with different contents of expansion agent to form different Deep anchoring body, and then anchor the anchor rod 9 inside the deep rock mass 1; the cushion layer 4 is arranged on the anchor rod 9 and at the edge of the fractured rock mass area 2. By adopting the reinforcement device of the above structure, in the construction process, by forming anchor bodies of different depths in the fractured rock mass area 2, and then reinforcing...
Embodiment 2
[0046] Any method for reinforcing different fractured areas of deep rock mass by using expansion agent head expansion effect, is characterized in that it includes the following steps:
[0047] Step1: Material preparation: ordinary cement mortar, expansion agent, anchor cable, anchor rod, acoustic wave detector;
[0048] Step2: Use a sound wave detector to detect: Use a sound wave detector to accurately locate the location, quantity and scope of the rupture area. The measured sound velocity is 4000m / s-6000m / s as a complete rock mass area, and the sound velocity is lower than 4000m / s. Rock mass area;
[0049] Step3: Drilling: Use a drilling machine to drill holes of corresponding size according to the divided area;
[0050] Step4: Configure water: cement: sand: expansion agent according to a certain mix ratio, and expand the cement mortar with a ratio of a: b: c: d, and prepare a certain proportion of ordinary cement slurry;
[0051] Step5: Assemble the anchor rod: Tighten one...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com