Construction method of door and window opening
A construction method and technology for door and window openings, which are applied in the processing of building materials, construction, building construction, etc., can solve problems such as high technical requirements and difficult construction, and achieve the goal of improving construction speed, saving engineering volume, and reducing construction costs. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0025] A construction method for door and window openings, the steps are as follows:
[0026] 1) Make beam support form 3 and wall support form 7;
[0027] 2) Erection of beam support formwork 3;
[0028] 3) Openings on both sides of the bottom of the beam support form 3
[0029] 4) Before the partition wall is poured, the wall support form 7 is erected, and the wall support form 7 includes the partition wall area 1 and the frame column area 2 to be poured;
[0030] 5) Open a second opening on both sides of the top of the frame column area 2 and below the bottom opening of the beam support mold 3;
[0031] 6) Erect the wall support form 7 on the bottom of the beam support form 3, and inject foam glue at the connection between the second opening of the frame column area 2 and the bottom opening of the beam support form 3;
[0032] 7) Concrete is poured in the beam support mold 3, and the integral molding includes the beam area, the partition wall area 1 and the frame column ...
Embodiment 2
[0039] A construction method for door and window openings, the steps are as follows:
[0040] 1) Make the beam support mold 3 and the wall support mold 7, install the first arc steel bar 4 and the second arc steel bar 5 in the beam support mold 3, the first arc steel bar 4 and the second arc steel bar The installation direction of article 5 is opposite;
[0041] 2) Erection of beam support formwork 3;
[0042] 3) Openings on both sides of the bottom of the beam support form 3
[0043] 4) Before the partition wall is poured, the wall support form 7 is erected, and the wall support form 7 includes the partition wall area 1 and the frame column area 2 to be poured;
[0044] 5) Open a second opening on both sides of the top of the frame column area 2 and below the bottom opening of the beam support mold 3;
[0045] 6) Erect the wall support form 7 on the bottom of the beam support form 3, and inject foam glue at the connection between the second opening of the frame column area...
Embodiment 3
[0052] A construction method for door and window openings, the steps are as follows:
[0053] 1) Make the beam support mold 3 and the wall support mold 7, install the first arc steel bar 4 and the second arc steel bar 5 in the beam support mold 3, the first arc steel bar 4 and the second arc steel bar The installation direction of the bar 5 is opposite; the square hanging steel bar and the vertical bracing steel bar are laid inside the frame column area 2 of the wall support form 7;
[0054] 2) Erection of beam support formwork 3;
[0055] 3) Openings on both sides of the bottom of the beam support form 3
[0056] 4) Before the partition wall is poured, the wall support form 7 is erected, and the wall support form 7 includes the partition wall area 1 and the frame column area 2 to be poured;
[0057] 5) Open a second opening on both sides of the top of the frame column area 2 and below the bottom opening of the beam support mold 3;
[0058] 6) Erect the wall support form 7 ...