Construction method of door and window opening

A construction method and technology for door and window openings, which are applied in the processing of building materials, construction, building construction, etc., can solve problems such as high technical requirements and difficult construction, and achieve the goal of improving construction speed, saving engineering volume, and reducing construction costs. Effect

Inactive Publication Date: 2018-12-21
徽都建设有限公司
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In the cast-in-place project, the reservation of the door and window openings of the wall is to set up the formwork at the corresponding part of the wall, and remove the formwork after the poured concrete reaches the specified strength. This method requires high technical requirements and difficulty in construction. Big

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of door and window opening

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0025] A construction method for door and window openings, the steps are as follows:

[0026] 1) Make beam support form 3 and wall support form 7;

[0027] 2) Erection of beam support formwork 3;

[0028] 3) Openings on both sides of the bottom of the beam support form 3

[0029] 4) Before the partition wall is poured, the wall support form 7 is erected, and the wall support form 7 includes the partition wall area 1 and the frame column area 2 to be poured;

[0030] 5) Open a second opening on both sides of the top of the frame column area 2 and below the bottom opening of the beam support mold 3;

[0031] 6) Erect the wall support form 7 on the bottom of the beam support form 3, and inject foam glue at the connection between the second opening of the frame column area 2 and the bottom opening of the beam support form 3;

[0032] 7) Concrete is poured in the beam support mold 3, and the integral molding includes the beam area, the partition wall area 1 and the frame column ...

Embodiment 2

[0039] A construction method for door and window openings, the steps are as follows:

[0040] 1) Make the beam support mold 3 and the wall support mold 7, install the first arc steel bar 4 and the second arc steel bar 5 in the beam support mold 3, the first arc steel bar 4 and the second arc steel bar The installation direction of article 5 is opposite;

[0041] 2) Erection of beam support formwork 3;

[0042] 3) Openings on both sides of the bottom of the beam support form 3

[0043] 4) Before the partition wall is poured, the wall support form 7 is erected, and the wall support form 7 includes the partition wall area 1 and the frame column area 2 to be poured;

[0044] 5) Open a second opening on both sides of the top of the frame column area 2 and below the bottom opening of the beam support mold 3;

[0045] 6) Erect the wall support form 7 on the bottom of the beam support form 3, and inject foam glue at the connection between the second opening of the frame column area...

Embodiment 3

[0052] A construction method for door and window openings, the steps are as follows:

[0053] 1) Make the beam support mold 3 and the wall support mold 7, install the first arc steel bar 4 and the second arc steel bar 5 in the beam support mold 3, the first arc steel bar 4 and the second arc steel bar The installation direction of the bar 5 is opposite; the square hanging steel bar and the vertical bracing steel bar are laid inside the frame column area 2 of the wall support form 7;

[0054] 2) Erection of beam support formwork 3;

[0055] 3) Openings on both sides of the bottom of the beam support form 3

[0056] 4) Before the partition wall is poured, the wall support form 7 is erected, and the wall support form 7 includes the partition wall area 1 and the frame column area 2 to be poured;

[0057] 5) Open a second opening on both sides of the top of the frame column area 2 and below the bottom opening of the beam support mold 3;

[0058] 6) Erect the wall support form 7 ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction method of a door and window opening. The construction method comprises the following steps that a cross beam support mold and a wall support mold are manufactured; the cross beam support is erected; opening are formed in the two sides of the bottom of the cross beam support mold; the wall support mold is erected before a partition wall is poured, wherein thewall support mold internally comprises a to-be-poured partition wall area and a frame holding column area; second openings are formed in the portions, below the openings in the bottom of the cross beam support mold, on the two sides of the top of the frame holding column area; the wall support mold is erected at the bottom of the cross beam support mold, and foaming glue is injected at the jointsbetween the second openings of the frame holding column area and the openings in the bottom of the beam support mold; concrete is poured in the cross beam support mold, and the cross beam area, the partition wall area and the frame holding column area are integrally formed. By means of integral pouring, the engineering quantity in the independent construction stage is saved, the operation difficulty is lowered, the construction speed is increased, and the construction cost is reduced; the connecting structure of cross beams and frame holding columns is safer and more reliable due to the integrally formed arrangement.

Description

technical field [0001] The invention relates to the technical field of building construction, in particular to a construction method for door and window openings. Background technique [0002] During building construction, it is usually necessary to design and construct door and window openings inside the building. When the door and window openings are set on the wall and the wall openings are larger than 300mm, in order to support various loads from the upper masonry of the door and window openings, and transfer these loads to the walls on both sides of the door and window openings, the door and window openings are often installed. beam. When the wall is turned or a door and window opening is opened on a thin T-shaped wall, in order to facilitate the placement of the door and window frame and ensure the stability of the wall, a frame column must be added to the partition wall on the side of the door and window opening. [0003] In the cast-in-place wall concrete project, ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E04G21/00
CPCE04G21/00
Inventor 叶兴国吕俊杰吕宗霞江玲
Owner 徽都建设有限公司