Method and device for production scheduling of PC components

A component and production line technology, applied in the field of PC component production scheduling methods and devices, can solve problems such as unreliable guessing, economic loss, and impact on production and operation, and achieve the effect of objective judgment results

Active Publication Date: 2022-06-21
CHINA CONSTR THIRD BUREAU GREEN IND INVESTMENT CO LTD +1
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, traditionally, builders can only estimate the possibility of completing the order on schedule based on past experience. However, due to changes in production conditions and environments, past experience may not be applicable to the current situation. Therefore, such guesses are often unreliable, and sometimes builders Accepting an order that exceeds the scope of its own production capacity, and finally failing to complete the order on schedule, resulting in breach of contract losses. Sometimes the builder rejects an order within the scope of its own production capacity, which will also cause economic losses
It can be seen that builders lack an effective evaluation method for development project orders to decide whether to accept orders, which will affect their production and operation

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method and device for production scheduling of PC components

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0037] The present invention is a method for production scheduling of PC components, which is used for scheduling the production of PC components according to the information of the development project on the order. The information of the development project includes the serial number of the development project and the construction period, such as figure 1 shown, including the following steps:

[0038] Calculate the shortest completion time corresponding to each development item in the order;

[0039] Compare the shortest completion time corresponding to each development project with the construction period required by the order, so as to judge whether the order can be completed on time;

[0040] If the order can be completed on time, the information of accepting the order will be returned, otherwise, the information of rejecting the order will be returned.

[0041] In the method of the present invention, the shortest completion time of each development project, the component...

Embodiment 2

[0091] The present invention also provides a PC component production scheduling device, comprising:

[0092] a memory for storing at least one program;

[0093] The processor is configured to load the at least one program to execute the production scheduling method for PC components described in Embodiment 1.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a PC component production scheduling method and device. The method includes calculating the shortest completion time corresponding to each development project in the order, and comparing the shortest completion time corresponding to each development project with the construction period required by the order, thereby judging whether the order can be completed on schedule, and if the order can be completed on schedule, return Accept the information of the order, otherwise, return the information of rejecting the order and other steps. Applying the method of the present invention, the construction period required by the order is the information of the order itself, and the shortest completion time corresponding to each development project in the order is the shortest completion time calculated by the builder according to the current own conditions when actually carrying out the construction of each development project , Therefore, the builder does not need to refer to past experience, but only needs to make a judgment based on the information of the order itself and the current conditions, and the judgment result is more objective. The invention is widely used in the technical field of building industrialization.

Description

technical field [0001] The invention relates to the technical field of construction industrialization, in particular to a production scheduling method and device for PC components. Background technique [0002] In the field of construction, especially the development of commercial buildings, builders often accept commissions through the order model, and carry out construction according to the order requirements. During large-scale development, the content on the order often includes multiple development projects, each development project includes multiple buildings, and the buildings are further subdivided into individual floors. In order to improve production efficiency, PC components are usually widely used in the construction of each floor. PC components, also known as Precast Concrete (Precast Concrete), refer to concrete products processed and produced by standardized and mechanized methods in factories. They generally have standard specifications and can be used as "p...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G06Q10/06G06Q10/10G06Q50/08
CPCG06Q10/06313G06Q10/103G06Q50/08
Inventor 杨玮潘寒黄熙萍卢仲兴高全叶万方雷光波邹贻权彭焱
Owner CHINA CONSTR THIRD BUREAU GREEN IND INVESTMENT CO LTD
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More