Steel bar press-straightening equipment for buildings
A technology for construction and steel bars, which is applied in the direction of injection devices, liquid injection devices, etc., can solve the problems of time-consuming and labor-intensive processing, waste of materials, etc., and achieve the effect of convenient operation and improved utilization rate
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0017] A kind of steel bar straightening equipment for construction, such as figure 1As shown, it includes a mounting plate 1, a table leg 2, a first rubber pad 3, a triangular leg 4, a pressure relief plate 5, a first connecting rod 6, a round hole pressure plate 7, a second rubber pad 8, and a first support rod 9 , the first cylinder 10, the first guide sleeve 11, the first guide rod 12, the hydraulic plate 13, the first piston 14, the first return spring 15, the second cylinder 16, the second guide rod 17, the second piston 18 , hydraulic oil 19, the first mounting seat 20, the first connecting rod 21 and the second connecting rod 22, the left and right sides of the bottom of the mounting plate 1 are provided with table legs 2, and the left and right sides of the top of the mounting plate 1 are embedded with There is a first rubber pad 3, a triangular outrigger 4 is placed on the top of the first rubber pad 3, and a pressure relief plate 5 is connected between the right tri...
Embodiment 2
[0019] A kind of steel bar straightening equipment for construction, such as figure 1 As shown, it includes a mounting plate 1, a table leg 2, a first rubber pad 3, a triangular leg 4, a pressure relief plate 5, a first connecting rod 6, a round hole pressure plate 7, a second rubber pad 8, and a first support rod 9 , the first cylinder 10, the first guide sleeve 11, the first guide rod 12, the hydraulic plate 13, the first piston 14, the first return spring 15, the second cylinder 16, the second guide rod 17, the second piston 18 , hydraulic oil 19, the first mounting seat 20, the first connecting rod 21 and the second connecting rod 22, the left and right sides of the bottom of the mounting plate 1 are provided with table legs 2, and the left and right sides of the top of the mounting plate 1 are embedded with There is a first rubber pad 3, a triangular outrigger 4 is placed on the top of the first rubber pad 3, and a pressure relief plate 5 is connected between the right tr...
Embodiment 3
[0022] A kind of steel bar straightening equipment for construction, such as figure 1 As shown, it includes a mounting plate 1, a table leg 2, a first rubber pad 3, a triangular leg 4, a pressure relief plate 5, a first connecting rod 6, a round hole pressure plate 7, a second rubber pad 8, and a first support rod 9 , the first cylinder 10, the first guide sleeve 11, the first guide rod 12, the hydraulic plate 13, the first piston 14, the first return spring 15, the second cylinder 16, the second guide rod 17, the second piston 18 , hydraulic oil 19, the first mounting seat 20, the first connecting rod 21 and the second connecting rod 22, the left and right sides of the bottom of the mounting plate 1 are provided with table legs 2, and the left and right sides of the top of the mounting plate 1 are embedded with There is a first rubber pad 3, a triangular outrigger 4 is placed on the top of the first rubber pad 3, and a pressure relief plate 5 is connected between the right tr...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 
