A construction technology and rail technology, applied in the direction of roads, roads, special pavements, etc., can solve problems such as hidden safety hazards, pedestrian inconvenience, vehicle jumping, etc., and achieve the effect of strong load bearing capacity, simple and reasonable structure, and reduced settlement difference.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment approach 1
[0019] Specific implementation mode one: as Figure 2~Figure 7 As shown, the present invention discloses an anti-jump cover plate for crossing road rails in an urban area, including a road 1 and two rails 2 crossing the road 1, and a plurality of rails are arranged under the two rails 2 Sleepers 3, the anti-jump cover plate also includes a plurality of unit cover plates 6, a plurality of rail clamping assemblies 7 and a plurality of bolts and nuts 8, the unit cover plate 6 is a rectangular plate, and one end is made into a comb-tooth shape The seam 6-1 is made into a slope 6-2 opposite the other end. The multiple unit cover plates 6 are divided into two groups and are respectively adjacent to the corresponding rails 2. The comb-tooth-shaped seam 6-1 is located on two The middle of the rails 2 is inserted and matched with each other. The slope 6-2 is set on the road 1 on the corresponding side and has a positioning hole 6-3 to be fixed by positioning bolts. The middle of the lo...
specific Embodiment approach 2
[0020] Specific implementation mode two: as figure 2 , 3 , 5, this embodiment is a further description of specific embodiment 1, the upper surface of the unit cover plate 6 is flush with the surface of the road 1, and the slope of the slope 6-2 is 10%~30% .
specific Embodiment approach 3
[0021] Specific implementation mode three: as Figure 2~Figure 7 As shown, this embodiment discloses a construction process of an anti-jump cover plate for crossing road rails in an urban area according to specific embodiment 1. The construction process includes the following steps:
[0022] Step 1: Take the rail clamp assembly 7 and clamp it on the upper end of the rail 2, then cover the unit cover plate 6 (made of steel plate, its thickness is 7mm~15mm), and fasten it to the rail clip through two rail webs 6-4 The upper end of the fixed component 7 forms a preliminary limit to prevent the two C-shaped steels of the rail clamping component 7 from being separated and opened, ensuring that the support vertical plate 6-5 is stably seated and supported on the sleeper 3 at the corresponding position, and the slope 6-2 can be effectively erected On the road 1, the road 1 on the side corresponding to the slope 6-2 is processed so that the upper surface of the unit cover plate 6 is f...