Sewage treatment system for sewage discharge outlets of landscape lake
The technology of a sewage treatment system and a sewage outlet is applied in the field of water environment pollution control, which can solve the problems of black and odorous lake water, and achieve the effects of saving water resources and reducing the content of ammonia nitrogen and phosphorus.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] see figure 1 , the sewage outlet 1 is arc-shaped, the distance a between each place on the side of the planting area 2 close to the sewage outlet 1 and the sewage outlet 1 is 3 meters, and the distance a between each place on the side of the planting area 2 far away from the sewage outlet 1 and the sewage outlet 1 The distance between mouth 1 is 5 meters, that is, the width b of planting area 2 is 1 meter.
[0041] In the planting area 2, water calamus, reeds and cannas are mixed. The planting positions of water calamus, reeds and cannas are designed according to the needs, and the specific planting positions will not have a substantial impact on this plan. The planting density of water calamus, reed and canna is 15 plants / m 2 , the roots of the above aquatic plants are directly planted in the bottom mud of the landscape lake.
Embodiment 2
[0043] see figure 2 The planting area 2 of sewage outlet 2 is in the shape of a "C". The vertical distance d between the short side and the long side of the planting area 2 near the sewage outlet 1 and the sewage outlet 1 is 3 meters, and the planting area 2 is far away from the sewage outlet. The vertical distance between the short side and the long side of one side and the sewage outlet 1 is 8 meters, that is, the width c of the planting area 2 is 5 meters.
[0044] Planting area 2 is divided into pollution area 21, transition area 22, and landscape area 23. Pollution area 21, transition area 22, and landscape area 23 are all in the shape of a "C". The boundaries of pollution area 21, transition area 22, and landscape area 23 Both are parallel to the boundary of the planting area 2, the distance between the short side and the long side of the polluted area 21 away from the sewage outlet 1 and the sewage outlet 1 is 5.5 meters, that is, the width of the polluted area 21 is 2...
Embodiment 3
[0048] see image 3 , the planting area 2 of the sewage outlet 3 is arc-shaped, the distance e between each part of the planting area 2 on the side close to the sewage outlet 1 and the sewage outlet 1 is 5 meters, and every part of the planting area 2 on the side far away from the sewage outlet 1 The distance between one place and the sewage outlet 1 is 7 meters, that is, the width f of the planting area 2 is 2 meters.
[0049] Planting area 2 is divided into polluted area 21, transitional area 22 and landscape area 23, polluted area 21, transitional area 22 and landscaped area 23 are all arc-shaped, the boundaries of polluted area 21, transitional area 22 and landscaped area 23 are all in line with planting area The boundaries of 2 are parallel, and the distance between each place on the side of the polluted area 21 away from the sewage outlet 1 and the sewage outlet 1 is 6 meters, that is, the width of the polluted area 21 is 1 meter, and the landscape area 23 is on the side...
PUM
Property | Measurement | Unit |
---|---|---|
width | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com