Water drainage device and double-pipe hydrofracturing in-situ stress measurement system
A measurement system and in-situ stress technology, applied in the field of fracturing, can solve problems such as the inability to realize the pressure operation of high-pressure hoses
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] see Figure 1 to Figure 4 As shown, the present invention provides a drainage device, which includes a puller, a valve core rod 102 and a valve body 103; the valve body 103 is provided with a valve core chamber, and the valve body 103 is also provided with The first water outlet hole 104 and the second water outlet hole 105; one end of the valve core rod 102 is communicated with a first pipe joint 108, and the other end of the valve core rod 102 is provided with a third water outlet hole 107 communicated with the first pipe joint 108 , and the other end of the valve core rod 102 is inserted into the valve core cavity; an elastic member is arranged between the valve core rod 102 and the valve body 103, and the pulling member is fixedly connected with the valve core rod 102 for pulling the valve core rod 102 to make it move along the The axial movement of itself makes the third water outlet hole 107 communicate with the first water outlet hole 104 or connects the third wa...
Embodiment 2
[0045] The present invention provides a double-pipe hydraulic fracturing ground stress measurement system, which includes the drainage device in the first embodiment.
[0046] see Figure 5 As shown, in this embodiment, the double-pipe hydraulic fracturing stress measurement system further includes a packer 125 , and the first water outlet hole 104 communicates with the packer 125 .
[0047] When in use, the valve body 103 of the drainage device is bound on the drill pipe 127, and the drill pipe 127 does not play the role of drilling, and it does not rotate. The other end of the rope structure is bound to a winch 128 located outside the borehole. The second high-pressure rubber hose 117 communicates with the packer 125, while the first high-pressure rubber hose 116 communicates with the setting pump 126 located outside the borehole. In the hydraulic fracturing double-pipe ground stress measurement test, the drainage device is located near the natural groundwater level. Ther...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com



