Vertical ladder for wall construction
A technology of vertical ladders and rope ladders, which is applied in the direction of ladders, buildings, building structures, etc., can solve the problems of not being able to take into account the vertical surface of the work and the lifting efficiency, and achieve the effect of simple structure and easy disassembly
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0020] Embodiment 1: A vertical ladder for wall construction, including a height-adjustable fixing device 1 , a rope ladder 3 , a fixing device at the top of the vertical ladder and a connecting device 5 .
[0021] A hanging part 11 is provided on the side of the height-adjustable fixing device 1 , and the height-adjustable fixing device 1 can drive the hanging part 11 to lift relative to the bottom end of the height-adjustable fixing device 1 . The height-adjustable fixing device 1 can choose a lifting frame, a telescopic rod or a tower hanger. When the height-adjustable fixing device 1 selects a lifting frame or a telescopic rod, the hanging part 11 is fixedly arranged on the side of the movable part of the lifting frame or the telescopic rod. For example, the hanging part 11 selects a rod-shaped object, and the rod-shaped object is welded and fixed to the top end of the lifting frame or the telescopic rod. In this embodiment, the tower hanger is selected. The tower hanger i...
Embodiment 2
[0028] Embodiment 2: A vertical ladder for wall construction, including a height-adjustable fixing device 1 , a rope ladder 3 , a fixing device at the top of the vertical ladder and a connecting device 5 . This embodiment is mostly the same as Embodiment 1, the difference is:
[0029]In this embodiment, the connecting rod is perforated as a rope buckle formed on the rope 32 of the rope ladder 3 . Since the rope can be tied with a fixed knot, the rope 32 of the rope ladder 3 can also form a connecting rod perforation. Specifically, the rope 32 can be wound around the connecting rod 311 once.
[0030] In this embodiment, the temporarily unused parts of the rope ladder 3 are tied together by the pulling rope 41 . The two ends of pulling rope 41 are respectively fixed on the suspender of tower hanger.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com