Resource scheduling method, base station and computer storage medium
A resource scheduling and base station technology, applied in the communication field, can solve problems such as limited CCE resources
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Example Embodiment
[0052] Example one
[0053] The embodiment of the present invention provides a resource scheduling method, figure 1 Schematic of the implementation process of a resource scheduling method proposed by an embodiment of the present invention Figure one ,Such as figure 1 As shown, in the embodiment of the present invention, the method for the base station to perform resource scheduling may include the following steps:
[0054] Step 101: Determine the active beam corresponding to the terminal to be scheduled from the preset beams; wherein the terminal to be scheduled is one of the multiple terminals that has not performed resource scheduling and has the highest scheduling priority.
[0055] In the embodiment of the present invention, the above-mentioned base station may first determine the active beam corresponding to the terminal to be scheduled from the preset beams. The above-mentioned preset beams are obtained by uniformly dividing the DOA range covered by the cell by the scheduler o...
Example Embodiment
[0081] Example two
[0082] figure 2 Schematic diagram of the implementation process of a resource scheduling method proposed by an embodiment of the present invention Figure II ,Such as figure 2 As shown, based on Embodiment 1, in the embodiment of the present invention, further, the above-mentioned base station according to the aggregation level corresponding to the terminal to be scheduled, the activated beam, the set of pre-stored CCE start positions corresponding to the activated beam, and The method of obtaining the set of pre-stored available CCEs corresponding to the activated beam and the scheduling parameters corresponding to the terminal to be scheduled may include the following steps:
[0083] Step 102a: Obtain the initial CCE location corresponding to the terminal to be scheduled.
[0084] In the embodiment of the present invention, the base station may first obtain the initial CCE position corresponding to the terminal to be scheduled after determining the active bea...
Example Embodiment
[0101] Example three
[0102] Figure 4 Schematic diagram of the implementation process of a resource scheduling method proposed by an embodiment of the present invention Figure Four ,Such as Figure 4 As shown, based on Embodiment 1, in the embodiment of the present invention, further, before the above-mentioned base station determines the active beam corresponding to the terminal to be scheduled from the preset beams, that is, before step 101, the above-mentioned method for resource scheduling by the base station is also It can include the following steps:
[0103] Step 106: Perform beam division according to the departure angle ranges corresponding to the multiple terminals to obtain a preset beam.
[0104] In the embodiment of the present invention, before the base station determines the active beam corresponding to the terminal to be scheduled from the preset beams, it needs to perform beam division according to the departure angle ranges corresponding to the multiple terminals...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap