Resource scheduling method, base station and computer storage medium

A resource scheduling and base station technology, applied in the communication field, can solve problems such as limited CCE resources

Active Publication Date: 2019-12-27
ZTE CORP
View PDF1 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] Embodiments of the present invention provide a resource scheduling method, a base station, and a computer storage medium, which can effectively solv

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Resource scheduling method, base station and computer storage medium
  • Resource scheduling method, base station and computer storage medium
  • Resource scheduling method, base station and computer storage medium

Examples

Experimental program
Comparison scheme
Effect test

Example Embodiment

[0052] Example one

[0053] The embodiment of the present invention provides a resource scheduling method, figure 1 Schematic of the implementation process of a resource scheduling method proposed by an embodiment of the present invention Figure one ,Such as figure 1 As shown, in the embodiment of the present invention, the method for the base station to perform resource scheduling may include the following steps:

[0054] Step 101: Determine the active beam corresponding to the terminal to be scheduled from the preset beams; wherein the terminal to be scheduled is one of the multiple terminals that has not performed resource scheduling and has the highest scheduling priority.

[0055] In the embodiment of the present invention, the above-mentioned base station may first determine the active beam corresponding to the terminal to be scheduled from the preset beams. The above-mentioned preset beams are obtained by uniformly dividing the DOA range covered by the cell by the scheduler o...

Example Embodiment

[0081] Example two

[0082] figure 2 Schematic diagram of the implementation process of a resource scheduling method proposed by an embodiment of the present invention Figure II ,Such as figure 2 As shown, based on Embodiment 1, in the embodiment of the present invention, further, the above-mentioned base station according to the aggregation level corresponding to the terminal to be scheduled, the activated beam, the set of pre-stored CCE start positions corresponding to the activated beam, and The method of obtaining the set of pre-stored available CCEs corresponding to the activated beam and the scheduling parameters corresponding to the terminal to be scheduled may include the following steps:

[0083] Step 102a: Obtain the initial CCE location corresponding to the terminal to be scheduled.

[0084] In the embodiment of the present invention, the base station may first obtain the initial CCE position corresponding to the terminal to be scheduled after determining the active bea...

Example Embodiment

[0101] Example three

[0102] Figure 4 Schematic diagram of the implementation process of a resource scheduling method proposed by an embodiment of the present invention Figure Four ,Such as Figure 4 As shown, based on Embodiment 1, in the embodiment of the present invention, further, before the above-mentioned base station determines the active beam corresponding to the terminal to be scheduled from the preset beams, that is, before step 101, the above-mentioned method for resource scheduling by the base station is also It can include the following steps:

[0103] Step 106: Perform beam division according to the departure angle ranges corresponding to the multiple terminals to obtain a preset beam.

[0104] In the embodiment of the present invention, before the base station determines the active beam corresponding to the terminal to be scheduled from the preset beams, it needs to perform beam division according to the departure angle ranges corresponding to the multiple terminals...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The embodiment of the invention discloses a resource scheduling method, a base station and a computer storage medium. The resource scheduling method comprises the following steps: determining an activation beam corresponding to a to-be-scheduled terminal from preset beams; obtaining scheduling parameters corresponding to the to-be-scheduled terminal according to the aggregation level correspondingto the to-be-scheduled terminal, the activation beam, a pre-stored control channel element CCE initial position set corresponding to the activation beam and a pre-stored available CCE set corresponding to the activation beam; updating a pre-stored CCE initial position set according to the CCE initial position, and updating a pre-stored available CCE set according to the CCE set so as to completea CCE allocation process of the to-be-scheduled terminal; continuously executing a CCE allocation process on the next to-be-scheduled terminal in the plurality of terminals until a plurality of scheduling parameters corresponding to the plurality of terminals are obtained; wherein one terminal corresponds to one scheduling parameter; and performing resource scheduling on the plurality of terminalsaccording to the plurality of scheduling parameters.

Description

technical field [0001] The present invention relates to the communication field, in particular to a resource scheduling method, a base station and a computer storage medium. Background technique [0002] With the continuous development of the fourth generation (4G) mobile communication system, Massive Multiple-Input Multiple-Output (Multiple-Input Multiple-Output, MIMO) technology will become an important technology for improving network capacity. Frequency Division Duplexing (FDD) is a kind of full-duplex communication technology used in mobile communication systems. Under the FDD system, because the uplink and downlink channels do not have reciprocity, it is not possible to use similar test-driven development ( Test-Driven Development, TDD) strategy to improve network capacity. However, under the FDD system, the departure angle (Departure Of Angle, DOA) of the uplink and downlink channels is reciprocal. The MassiveMIMO technology divides the cell into multiple preset beam...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): H04W72/04H04W72/12
CPCH04W72/046H04W72/51H04W72/566H04W72/04H04W72/12
Inventor 万祖辉
Owner ZTE CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products