Wire and cable construction paying-off device
A wire and cable and equipment technology, applied in the field of wire and cable construction and pay-off equipment, can solve the problems of difficult repair and maintenance, inconvenient movement, high cost, etc., and achieve the effects of low cost, convenient handling and wide application range
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0015] In order to make the technical means, creative features, goals and effects achieved by the present invention easy to understand, the present invention will be further described below in conjunction with specific embodiments.
[0016] Such as Figure 1-2 As shown, a wire and cable construction pay-off equipment includes a box body 1, a chute 2 is provided at the top and bottom of the box body 1 close to the front, and the inner surface of the chute 2 is close to the symmetrical position on both sides of the box body 1 through bolts. , the nut and the gasket are fixedly connected with a sliding rod 3, the outer surface of the sliding rod 3 is covered with a sliding seat 4, and the side of the sliding seat 4 close to each other is connected with an arc-shaped plate 5, and the inner surface of the arc-shaped plate 5 is provided with several A rotating roller 6, when in use, place the two box bodies coaxially, and the distance between them is adapted to the cable wire roller...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

