Regional complex two-stage economic dispatching method considering water-light-storage complementation
A technology of economic scheduling and consortium, applied in the direction of instruments, data processing applications, forecasting, etc., can solve the problems that do not take into account the complex connection of electric power in cascaded hydropower groups
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0080] The technical solution of the present invention will be further described in detail below in conjunction with the accompanying drawings, but the protection scope of the present invention is not limited to the following description.
[0081] The step flow chart of the present invention is as figure 1 Shown, the structural diagram of the present invention is as figure 2 As shown, the specific implementation steps are as follows:
[0082] (1) Step 1: Internal optimization of regional associations.
[0083] Multiple independent areas are combined to form a regional federation to share the remaining power. The optimization of the internal power sharing of the regional federation is based on the call of controllable elements and the output of uncontrollable elements, and the optimization is based on hours. Time scale, a total of 24 optimization periods. In optimization, make full use of the power exchange between different regions and the flexible adjustment capability of...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com