Subway public area decoration integrated design construction method based on BIM and VR

A technology that integrates design and construction methods, applied in the direction of geometric CAD, etc., can solve problems such as imperfect systems, policies and technologies, separation of architecture and decoration, large differences between decoration design schemes and finished decoration products, etc.

Pending Publication Date: 2020-05-22
BEIJING RAIL TRANSIT CONSTR MANAGEMENT
3 Cites 4 Cited by

AI-Extracted Technical Summary

Problems solved by technology

However, the traditional decoration model is not ideal for subway decoration. The root cause is that the system, policy and technology of traditional decoration itself are not perfect, resulting in large differences between ...
View more

Method used

Building Information Modeling (Building Information Modeling, referred to as BIM) technology can realize the integration of building information, from the design, construction, operation of the building to the end of the whole life cycle of the building, all kinds of information are always integrated in a three-dimensional model information database , the design team, construction unit, facility operation department and owners can work together based on BIM to effectively improve work efficiency, save resources and reduce costs. The embodiment of the present invention is based on the fine-decorated BIM model in the public area of ​​the subway station constructed, and VR virtual reality is used as the display mode. The BIM model and VR technology are combined to compare and select the station fine-decorated design scheme through the VR visualization method. According to the results of comparison and verification, the model scheme is modified to confirm the optimal scheme.
In the embodiment of the present invention, the ...
View more

Abstract

The embodiment of the invention provides a subway public area decoration integrated design construction method based on BIM and VR. The method comprises the steps of building a first BIM model of a target subway public area according to a two-dimensional decoration design drawing or design scheme model of the target subway public area; based on a VR technology, generating a first VR virtual spaceaccording to the first BIM model, and adjusting the first BIM model through the first VR virtual space to obtain a second BIM model; converting the second BIM model into a BIM white model through BIMsoftware; and based on a UE4 technology, generating a second VR virtual space according to the BIM white module so as to display a decoration design scheme of the target subway public area according to the second VR virtual space. According to the embodiment of the invention, the BIM technology and the VR technology are combined, so that the decoration engineering BIM model of the subway public area is fused into the three-dimensional virtual space, and the formulation of a decoration design scheme and a construction scheme of the subway public area is facilitated.

Application Domain

Geometric CAD

Technology Topic

Virtual spaceEngineering management +3

Image

  • Subway public area decoration integrated design construction method based on BIM and VR
  • Subway public area decoration integrated design construction method based on BIM and VR
  • Subway public area decoration integrated design construction method based on BIM and VR

Examples

  • Experimental program(1)

Example Embodiment

[0039] In order to make the purposes, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments These are some embodiments of the present invention, but not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.
[0040] Building Information Modeling (BIM) technology can realize the integration of building information, from the design, construction, operation of the building to the end of the whole life cycle of the building, all kinds of information are always integrated into a 3D model information database, the design team , construction units, facility operation departments and owners and other parties can work together based on BIM to effectively improve work efficiency, save resources and reduce costs. The embodiment of the present invention is based on the constructed BIM model of the fine decoration in the public area of ​​the subway station, VR virtual reality is the display method, the BIM model and the VR technology are combined, and the station fine decoration design scheme is compared and selected through the VR visualization method. According to the results of comparison and verification, the model scheme is modified to confirm the optimal scheme.
[0041] figure 1 A schematic flowchart of an integrated design and construction method for decoration of subway public areas based on BIM and VR provided by the embodiment of the present invention, such as figure 1 As shown, the embodiment of the present invention provides an integrated design and construction method for decoration of subway public areas based on BIM and VR, including:
[0042] Step 101 , construct a first BIM model of the target subway public area according to the two-dimensional decoration design drawing or design scheme model of the target subway public area.
[0043] In the embodiment of the present invention, the two-dimensional decoration design drawing or decoration design scheme model of the target subway public area is input into the BIM software, so as to obtain the first BIM model of the target subway public area.
[0044]Step 102 , based on the VR technology and according to the first BIM model, generate a first VR virtual space, and adjust the first BIM model through the first VR virtual space to obtain a second BIM model.
[0045] In the embodiment of the present invention, a VR virtual space corresponding to the first BIM model, that is, the first VR virtual space, is generated through the VR technology, and then, based on the VR virtual space, the designer can integrate the spatial awareness into the three-dimensional virtual space through the VR device. In the space, the best design sensory effect can be achieved, so that the decoration design scheme in the BIM model can be adjusted to obtain a second BIM model. When the subsequent decoration and construction of the target subway public area is carried out, the decoration project construction is more reasonable, thereby reducing The difference between the decoration design scheme and the finished decoration.
[0046] Step 103: Convert the second BIM model into a BIM white model by using BIM software.
[0047] In the embodiment of the present invention, the second BIM model can also be converted to a white model by using the 3DMAX technology to obtain a BIM white model, that is, the basic model of the subway public area is obtained.
[0048] Step 104 , based on the UE4 technology and according to the BIM white model, a second VR virtual space is generated, so as to display the decoration design scheme of the target subway public area according to the second VR virtual space.
[0049] In the embodiment of the present invention, a more realistic VR virtual space is created through UE4 technology, so that relevant personnel can have an immersive experience, so as to minimize the difference between the decoration design scheme of the public area of ​​the subway and the final decoration product.
[0050] The embodiment of the present invention provides an integrated design and construction method for the decoration of subway public areas based on BIM and VR, which combines BIM and VR technologies, so that the BIM models of the decoration projects in the subway public areas are integrated into the three-dimensional virtual space, which is more conducive to the formulation of subway public areas. Regional decoration design.
[0051] On the basis of the above embodiment, after the UE4 technology and the BIM white model are used to generate a second VR virtual space to display the decoration scheme of the target subway public area according to the second VR virtual space, The method also includes:
[0052] The construction is carried out according to the decoration scheme corresponding to the second VR virtual space, and the 3D point cloud scanning is performed on the target subway public area after the civil construction is completed to obtain the on-site 3D point cloud data of the target subway public area;
[0053] The on-site three-dimensional point cloud data is input into the second BIM model to generate a third BIM model, so as to formulate a subsequent construction plan according to the third BIM model.
[0054] In the embodiment of the present invention, after the civil construction is completed according to the decoration plan, 3D point cloud scanning is performed on the site of the target subway public area, so as to obtain the 3D point cloud data of the target subway public area after the civil construction is completed; further, the The 3D point cloud data is input into the second BIM model for adjustment, and the third BIM model is generated. Obtain the actual decoration specifications of the target subway public area, and instruct the factory to directly produce the corresponding decoration materials, so that the materials can be transported to the site for component assembly, so as to achieve the purpose of prefabricated decoration, and avoid production due to discrepancies between the design specifications and the actual decoration specifications. The decoration materials have large differences in defects.
[0055] Based on the above embodiment, the first BIM model includes: a BIM model plane, a BIM model elevation, a BIM model section, and BIM model information.
[0056] In the embodiment of the present invention, according to the BIM model output construction drawing standard, the BIM model plane, the BIM model elevation and the BIM model section are dimensioned to ensure the BIM model plane, BIM model elevation and BIM model in the first BIM model. The unity of section expression and the integrity and correctness of professional design. Further, in an embodiment of the present invention, according to the BIM model information, the uniformity of the dimensions and annotations of the main components in the structural professional model is checked, so that the model depth and the two-dimensional design depth are consistent.
[0057] On the basis of the above embodiment, the construction of the first BIM model of the target subway public area according to the two-dimensional decoration design drawing or design scheme model of the target subway public area includes:
[0058] According to the two-dimensional decoration design drawing or design scheme model of the target subway public area, construct the three-dimensional model of the target subway public area;
[0059] Based on the design parameters of the preset structural model and the preset electromechanical model, the ceiling, ground, wall and column decoration components and display equipment and facilities in the station are added to the three-dimensional model, and the first BIM model of the target subway public area is obtained. The equipment and facilities displayed in the station shall at least include: guide sign system, escalators, automatic ticket machines, security inspection facilities, ticket booths, billboards, screen doors, turnstiles, PIS screens, emergency evacuation signs and professional equipment terminals for various systems.
[0060] In the embodiment of the present invention, on the basis of the three-dimensional model of the target subway public area, the design parameters of the preset structural model and the preset electromechanical model are added with models such as ceiling, lamps, ceiling, ground, and wall and cylindrical decoration components. And arrange display equipment and facilities in the station, such as guide sign system, escalators, automatic ticket machines, security check facilities, ticket booths, billboards, screen doors, gates, PIS screens, smoke alarms, emergency evacuation signs, guide signs in the station, Models such as blind lanes and professional equipment terminals of various systems can also adjust the position of unreasonable design schemes in real time according to the matching of environmental colors and lamps, so as to improve the details in the three-dimensional model and obtain the first model of the target subway public area.
[0061] On the basis of the above embodiment, after the first BIM model of the target subway public area is constructed according to the two-dimensional decoration design drawing or design scheme model of the target subway public area, the method includes:
[0062] Based on the first BIM model, the first decoration design layout information and the second decoration design layout information are obtained. The first decoration design layout information includes the decoration design layout information of the professional equipment terminals of each system and the professional pipeline channels. The second decoration design layout information includes the decoration design layout information of the decoration wall, ceiling, ground and cylinder of the target subway public area;
[0063] The overall coordination between the first decoration design layout information and the second decoration design layout information is obtained, so as to adjust the decoration design layout corresponding to each system professional equipment terminal and each professional pipeline channel.
[0064] In the embodiment of the present invention, after obtaining the first BIM model, it is necessary to analyze the overall coordination between the professional equipment terminals and professional pipeline channels of each system and the decoration walls, ceilings, floors and cylinders of the target subway public area. For example, since the equipment layout determines the modulus of the wall material, in order to meet the requirements of the ceiling's virtual and real effect, local improvement and unit modulus, it is necessary to adjust the ventilation openings, Fire Alarm System (FAS), broadcasting and guidance, etc. Adjust the equipment layout; accordingly, according to the equipment layout requirements, the decoration design layout of the decoration walls, ceilings, floors and cylinders of the target subway public area can also be adjusted.
[0065] Further, in the embodiment of the present invention, the lighting scheme in the decoration design scheme is supplemented or adjusted according to the first BIM model of the target subway public area. Since subway lighting is a complex project, there are many areas in the subway, such as entry and exit passages, station halls, platforms, carriages and tracks, etc. These areas are affected by factors such as natural lighting, crowd density, regional functions and light environment comfort. Influence, the lighting needs of different areas are not the same. The lighting methods generally used are basic lighting, guiding lighting, decorative lighting, interval lighting, advertising lighting and emergency lighting. In the embodiment of the present invention, based on the first BIM model of the target subway public area, the lighting, light effects and materials in the subway station in the decoration design scheme are added or adjusted, so as to carry out various lighting and lighting in the station according to the requirements of the design scheme. and material scheme settings.
[0066] On the basis of the above embodiment, the overall coordination between the acquired first decoration design layout information and the second decoration design layout information is used for the professional equipment terminals of each system and each professional pipeline. After the decoration design layout corresponding to the channel is adjusted, the method further includes:
[0067] Adjust the decoration design layout corresponding to each system professional equipment terminal and each professional pipeline channel in the first BIM model, and review and verify the adjusted decoration design layout. A BIM model.
[0068] In the embodiment of the present invention, the first BIM model needs to be reviewed and verified. If the design requirements of the first BIM model meet the preset requirements, for example, the design scheme has no defects (station commercial advertisements, self-service sales, barrier-free facilities and information services) Whether the setting is perfect), the materials selected meet the standard, etc., and the materials and processes that do not meet this standard must be adjusted in time (safety laminated glass must be used for railings and handrails, and the installation of ceiling aluminum panels must be hooked keel system, etc.), then the first A BIM model passes the review. If the review and verification fails, the first BIM model needs to be remodeled.
[0069] On the basis of the above embodiment, the VR-based technology, according to the first BIM model, the first VR virtual space includes:
[0070] Input the first BIM model into Fuzor software to generate a first VR virtual space.
[0071] In the embodiment of the present invention, the first BIM model is input into the Fuzor software, and further design changes are made to the first BIM model through the Fuzor software, components can be added and deleted, and components can be accurately moved and placed to achieve the best design The lighting conditions can also be adjusted to compare the impact of different lighting on different design schemes, and these changes can be reverse-synchronized into the BIM software. In the embodiment of the present invention, by designing in a VR environment, space awareness can be integrated into the decoration design scheme. This sense of space opens up a new design workflow that is different from traditional two-dimensional design, so as to achieve the best space Utilization and design effects.
[0072] On the basis of the foregoing embodiment, the adjusting of the first BIM model through the first VR virtual space to obtain a second BIM model includes:
[0073] Through the first VR virtual space, the decoration style, color matching, decoration style, environmental color and lighting effect in the virtual scene of the target subway public area are adjusted, and the guidance sign system and signs in the virtual scene of the target subway public area are adjusted. The sign is verified, and if the verification is passed, a second BIM model is obtained.
[0074]In the embodiment of the present invention, after the VR file is generated by the Fuzor software, the VR file can be opened through the VR terminal for scheme comparison, and a variety of decoration schemes can be compared and selected in the virtual scene, so as to truly restore the reality and facilitate comparison and decision-making. For example, in the virtual scene, adjust the ceiling style, color matching, style, ambient color and lighting effect matching in the subway station. Further, the VR terminal is used to simulate the subway station's guide signs, fire evacuation signs, emergency equipment signs, station nameplates, signs, etc. in the virtual reality space, so as to verify the guide sign system and signage. In the embodiment of the present invention, since the clarity of the sign has a great relationship with the color used, the same size of the sign is viewed at the same viewing distance, and the larger the sign at the same viewing distance, the shorter the recognition time of people, and the shorter the identification time. The length and size settings depend on how long it is expected to take to complete the identification. Depending on the background color of the sign and the color of the text symbols on it, visibility and how long it takes to identify it can make a big difference. Generally speaking, the higher the warning level, the brighter the colors used and the greater the color contrast. Therefore, in the virtual scene, the identification sign can be better verified.
[0075] figure 2 A schematic diagram of the overall flow of the integrated design and construction method for the decoration of subway public areas based on BIM and VR provided by an embodiment of the present invention, please refer to figure 2 As shown in the figure, after the preliminary design of the refined decoration scheme in the public area of ​​the subway is completed, a BIM model is constructed according to the refined decoration scheme, and the decoration schemes such as lighting, light and materials are set and adjusted according to the BIM model, and then the adjusted decoration scheme is adjusted. The BIM model will be reviewed. If the review is passed, the decoration scheme will be further compared and selected through the VR terminal to determine the optimal decoration design scheme, so as to rebuild the BIM model according to the optimal decoration design scheme; if the review fails, the BIM model will be reviewed. make modifications; further, refer to figure 2 As shown in the figure, after the decoration scheme is compared and selected, the signage in the virtual scene can also be verified through the VR terminal. If the verification fails, the decoration scheme of the signage will be redesigned.
[0076] image 3 A schematic structural diagram of the integrated design and construction system for decoration of subway public areas based on BIM and VR provided by the embodiment of the present invention, such as image 3 As shown, the embodiment of the present invention provides an integrated design and construction system for decoration of subway public areas based on BIM and VR, including a BIM model generation module 301, a VR design module 302, a white model conversion module 303 and a UE4 module 304, wherein the BIM model The model generation module 301 is used for constructing the first BIM model of the target subway public area according to the two-dimensional decoration design drawing or design scheme model of the target subway public area; the VR design module 302 is based on VR technology, according to the first BIM model , generate a first VR virtual space, and adjust the first BIM model through the first VR virtual space to obtain a second BIM model; the white model conversion module 303 is used to convert the second BIM model through BIM software The model is converted into a BIM white model; the UE4 module 304 is used to generate a second VR virtual space based on the UE4 technology and according to the BIM white model, so as to display the decoration design scheme of the target subway public area according to the second VR virtual space .
[0077] The integrated design and construction system for decoration of subway public areas based on BIM and VR provided by the embodiment of the present invention combines BIM and VR technologies, so that the BIM model of the decoration project of subway public areas is integrated into the three-dimensional virtual space, which is more conducive to the formulation of subway public areas. Regional decoration design.
[0078] The system provided by the embodiments of the present invention is used to execute the above method embodiments. For specific processes and details, please refer to the above embodiments, which will not be repeated here.
[0079] Figure 4 A schematic structural diagram of an electronic device provided by an embodiment of the present invention, refer to Figure 4 , the electronic device may include: a processor (processor) 401, a communication interface (Communications Interface) 402, a memory (memory) 403 and a communication bus 404, wherein the processor 401, the communication interface 402, and the memory 403 complete the communication through the communication bus 404. communication between. The processor 401 can call the logic instructions in the memory 403 to execute the following method: construct the first BIM model of the target subway public area according to the two-dimensional decoration design drawing or design scheme model of the target subway public area; based on the VR technology, According to the first BIM model, a first VR virtual space is generated, and the first BIM model is adjusted through the first VR virtual space to obtain a second BIM model; through BIM software, the second BIM model is The model is converted into a BIM white model; based on the UE4 technology, a second VR virtual space is generated according to the BIM white model, so as to display the decoration design scheme of the target subway public area according to the second VR virtual space.
[0080] In addition, the above-mentioned logic instructions in the memory 403 can be implemented in the form of software functional units and can be stored in a computer-readable storage medium when sold or used as an independent product. Based on this understanding, the technical solution of the present invention can be embodied in the form of a software product in essence, or the part that contributes to the prior art or the part of the technical solution. The computer software product is stored in a storage medium, including Several instructions are used to cause a computer device (which may be a personal computer, a server, or a network device, etc.) to execute all or part of the steps of the methods described in the various embodiments of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, Read-Only Memory (ROM, Read-Only Memory), Random Access Memory (RAM, Random Access Memory), magnetic disk or optical disk and other media that can store program codes .
[0081] On the other hand, an embodiment of the present invention further provides a non-transitory computer-readable storage medium on which a computer program is stored, and the computer program is implemented when executed by a processor to execute the BIM- and VR-based storage medium provided by the foregoing embodiments. An integrated design and construction method for decoration of a subway public area, for example, comprising: constructing a first BIM model of the target subway public area according to a two-dimensional decoration design drawing or design scheme model of the target subway public area; based on VR technology, according to the first BIM model of the target subway public area; The BIM model is used to generate a first VR virtual space, and the first BIM model is adjusted through the first VR virtual space to obtain a second BIM model; the second BIM model is converted into a BIM white model through the BIM software. based on UE4 technology and according to the BIM white model, a second VR virtual space is generated to display the decoration design scheme of the target subway public area according to the second VR virtual space.
[0082] The device embodiments described above are only illustrative, wherein the units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in One place, or it can be distributed over multiple network elements. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution in this embodiment. Those of ordinary skill in the art can understand and implement it without creative effort.
[0083] From the description of the above embodiments, those skilled in the art can clearly understand that each embodiment can be implemented by means of software plus a necessary general hardware platform, and certainly can also be implemented by hardware. Based on this understanding, the above-mentioned technical solutions can be embodied in the form of software products in essence or the parts that make contributions to the prior art, and the computer software products can be stored in computer-readable storage media, such as ROM/RAM, magnetic A disc, an optical disc, etc., includes several instructions for causing a computer device (which may be a personal computer, a server, or a network device, etc.) to perform the methods described in various embodiments or some parts of the embodiments.
[0084] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, but not to limit them; although the present invention has been described in detail with reference to the foregoing embodiments, those of ordinary skill in the art should understand that it can still be The technical solutions described in the foregoing embodiments are modified, or some technical features thereof are equivalently replaced; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.

PUM

no PUM

Description & Claims & Application Information

We can also present the details of the Description, Claims and Application information to help users get a comprehensive understanding of the technical details of the patent, such as background art, summary of invention, brief description of drawings, description of embodiments, and other original content. On the other hand, users can also determine the specific scope of protection of the technology through the list of claims; as well as understand the changes in the life cycle of the technology with the presentation of the patent timeline. Login to view more.
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products