Retard-bonded shear nail, steel-concrete composite beam and construction method of steel-concrete composite beam
A shear nail and slow bonding technology, applied in bridges, structural elements, bridge parts, etc., can solve the problem of reducing the introduction of concrete prestress, and achieve the effect of convenient and simple construction, avoiding cumbersome procedures, and reliable construction quality.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0028] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0029] like Figure 1-Figure 3 , Embodiment 1 of the present invention provides a slow bonding shear stud, including a sleeve 1 and a stud welding stud 2, the sleeve 1 includes a cylinder body 3 and an upper cover 4, and the upper cover 4 and the cylinder body 3 Threaded connection, the upper cover 4 is located at the top of the cylinder body 3, the cylinder body 3 and the upper cover 4 form a storage cavity, the storage cavity is filled with slow-bonding adhe...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


