18results about How to "Avoid cumbersome procedures" patented technology

Low-voltage switch cabinet facilitating internal cable management

The utility model relates to low -voltage switchgear technical field especially is related to a low -voltage switchgear convenient for internal wire arrangement, including cabinet, the inside of cabinet sets up backplate, and the both edges of backplate verticality set up vertical wire arrangement groove respectively, and even set up several horizontal wire arrangement groove between two vertical wire arrangement grooves, horizontal wire arrangement groove body sets up first bottom plate, and first bottom plate slidingly connects second bottom plate, and the both sides of first bottom plate and second bottom plate body set up vertical long side board, and the both ends of long side board are connected short side board respectively, and short side board bottom slidingly connects third bottom plate in vertical wire arrangement groove, and the sliding of short side board is used for adjusting the opening width of horizontal wire arrangement groove, to adapt to the cable of different quantity and diameter, and this low -voltage switchgear wire groove capacity can adjust, can adapt to different wiring demand.
Owner:HEBEI WANFENG GENGTAI ELECTRICAL EQUIP CO LTD

Flexible Grinding Device and Method for Knife Marks

This invention belongs to the field of 3C workpiece grinding technology, and particularly relates to a flexible grinding device and method for tool marks. It overcomes the shortcomings of existing technologies, such as unreasonable design. This flexible grinding device includes a rotating ring disk. A flexible grinding brush bundle forming a circle is provided on the lower surface of the rotating ring disk. A follower disk parallel to the rotating ring disk is provided on the upper surface of the rotating ring disk. A deflector disk is provided inside the rotating ring disk. A deflection drive mechanism is provided on the follower disk to drive the deflector disk to swing relative to the rotating ring disk. A flexible grinding oscillating brush bundle is provided on the lower surface of the deflector disk. Several vertical arc-shaped grooves are provided on the inner wall of the rotating ring disk. Several transverse elastic elements that elastically abut against the vertical arc-shaped grooves are provided on the outer circumferential surface of the deflector disk. Advantages of this application: By using a deflector disk with varying heights and adjustable angles, it can thoroughly grind tool marks on the large flat surfaces and boss surfaces of the workpiece, as well as the outer circumferential surfaces of the bosses.
Owner:RI SHAN COMPUTER ACCESSORY (JIASHAN) CO LTD

Movable cable trough for translation track

ActiveCN224068263Uavoid drag damageEliminate the need for assisted mobilityElectrical apparatusElectric cablesDrilling machines
The utility model discloses a movable cable trough for a translation track. The movable cable trough comprises an elevated cable trough fixedly installed at the rear end of the top layer of a drilling machine base. A middle cable trough is arranged below the elevated cable trough, one end of the middle cable trough is connected with the elevated cable trough, and the other end of the middle cable trough extends to the track cable trough; the track cable trough is installed on a drilling machine translation track on the driller side of the drilling machine and fixedly connected with the rear end of the bottom layer of the drilling machine base through a pull rod device. A rolling bar is mounted at the bottom of the track cable trough through a pin and a lug plate, and is in rolling contact with the drilling machine translation track; a cable transfer box is arranged on the track cable groove corresponding to the rear end area of the rolling bar; limiting devices are installed at the two ends of the rolling bar respectively and located on the two sides of a driller side track of the drilling machine translation track. The utility model effectively solves the problems of the traditional cable trough in the translation process of the drilling machine, improves the working efficiency and safety, and has obvious technical effect and practical application value.
Owner:LANZHOU LS PETROLEUM EQUIP ENG CO LTD

A segmented liner for a suspended roller mill

ActiveCN224486164Ueffective contactQuickly release fastened connectionsStructural engineeringWasher
The utility model relates to the technical field of suspension roller flour mill, concretely to a kind of block type lining for suspension roller flour mill, including pedestal;Lining assembly, the lining assembly includes several lining bodies, several lining bodies are movably connected in the inside of pedestal and several lining bodies are annular array distribution, the side of several lining bodies is respectively fixedly connected with connecting block one, the bottom of connecting block one is fixedly connected with clamping block, the side opposite of clamping block is respectively fixedly connected with sealing washer.The block type lining for suspension roller flour mill, when lining body appears serious wear due to long-term grinding when using the device, operator only needs to unscrew fixed bolt one, can quickly release the fastening connection of lining and pedestal, easily dismantle and replace single-piece worn lining from pedestal, this modular design not only greatly simplifies dismounting step, avoids the cumbersome procedure that traditional integrated lining needs to be dismantled as a whole.

A method for improving the thermal shock resistance of coatings by in-situ generation of highly bonded Cr2O3 interfaces

This invention discloses a method for in-situ generating a highly bonded Cr2O3 interface to improve the thermal shock resistance of coatings. The method involves a coating preparation technique, particularly in the process of preparing a coating on a Cr-containing metal substrate, where an electric field of specific intensity is applied during the high-temperature heat treatment stage. By utilizing the electric field to induce the outward diffusion of Cr ions and the inward migration of oxygen ions in the substrate, a dense Cr2O3 transition layer is in-situ induced at the interface between the coating and the metal substrate. This transition layer effectively alleviates the problem of thermal expansion coefficient mismatch between the ceramic coating and the metal substrate, releases interfacial thermal stress, and significantly enhances the bonding strength of the coating. This invention achieves control over the thickness of the transition layer by adjusting the current intensity. Experiments show that this method can significantly suppress the generation of microcracks during thermal shock cycling, thereby greatly improving the thermal shock resistance of the coating and effectively solving the problem of easy cracking and peeling of oxide coatings during high-temperature thermal cycling.
Owner:HUAZHONG UNIV OF SCI & TECH

Normal-pressure tool changing tooling reverse pressure maintaining experiment device and experiment method

PendingCN122709029Areduce weightlow cost
The application discloses a normal-pressure tool changing tooling reverse pressure maintaining experimental device and experimental method, and aims to solve the technical problems of long experimental period, large investment and low efficiency of the reverse pressure maintaining experiment of the existing normal-pressure tool changing tooling; the experimental device comprises an experimental cylinder which is closed at one end with an end plate and has a shoulder at the other end, a liquid injection pipe which penetrates through the end plate and is fixed opposite to the end plate, a flushing ball valve and a pressure relief ball valve which are connected in parallel and arranged at the entrance of the liquid injection pipe, and a pressure gauge which is correspondingly arranged between the entrance of the liquid injection pipe and the flushing ball valve; the experimental device has the characteristics of light weight and low cost, so that the normal-pressure tool changing tooling can be subjected to pressure maintaining experiment before leaving the factory, and one person can operate the experimental device without the aid of external mechanical lifting equipment, and the operation is simple and convenient; and the leakage observation area between the shoulder of the experimental cylinder and the flange of the tool cylinder seat is reserved by the limiting block, so that the leakage point can be quickly and directly found, and the sealing failure position is identified, thereby providing guidance for subsequent sealing maintenance.
Owner:CHINA RAILWAY TUNNEL GROUP CO LTD +1

Pile foundation construction platform and hanging box bottom plate integrated structure and construction method

PendingCN121976566AQuickly achieve pouring and moldingAvoid cumbersome proceduresArtificial islandsUnderwater structuresArchitectural engineeringCaisson
The invention discloses a pile foundation construction platform and hanging box bottom plate integrated structure and a construction method, and belongs to the technical field of pile foundation construction.The construction method specifically comprises the following steps that S1, a construction platform is erected, a plurality of temporary supporting piles are driven into a preset installation position, and an integrated platform bottom plate structure is erected on the tops of the temporary supporting piles; s2, pile foundation construction is conducted, specifically, pile forming construction of all engineering piles is conducted on the integrated platform bottom plate structure; s3, side plates are erected, specifically, the side plates are erected on the top of the integrated platform bottom plate structure; s4, the platform is lowered, the formed hanging box is hoisted, connection between the temporary supporting piles and the integrated platform bottom plate structure is removed, then the temporary supporting piles are removed, and the formed hanging box is hoisted and lowered to the designated position of the engineering pile; and S5, bearing platform construction is conducted, sealing treatment is conducted on gaps of the hanging box, then water pumping is conducted on the hanging box, and pouring of the bearing platform is achieved in a layered mode. The method has the effects that the construction period of bearing platform forming is shortened, and the construction efficiency is improved.
Owner:CRCC HARBOR & CHANNEL ENG BUREAU GRP

Magnesium alloy wheel manufacturing assembly die

The application discloses a magnesium alloy wheel manufacturing combined die, which comprises a casting die and a forging die. The casting die comprises a first upper die plate, a first upper punch, a first lower die plate, a first lower punch and a first side punch. The first lower punch is provided with a first boss and a second boss on the top. The first side punch is installed on the first lower punch to form a die cavity. The forging die comprises a second upper die plate, a second upper punch, a second lower die plate, a second lower punch and a second side punch. The bottom of the second upper punch is provided with a third boss and a fourth boss. The diameter of the third boss is smaller than that of the first boss, and the diameter of the fourth boss is smaller than that of the second boss. The top of the second lower punch is provided with a first groove and a second groove. The second side punch is installed on the second lower die plate to form a die cavity. The magnesium alloy wheel is manufactured by using the two sets of combined dies in sequence, so that the problem that the spokes of the magnesium alloy wheel cannot be directly formed is solved, and the mechanical properties of the spokes are improved.
Owner:ZHONGBEI UNIV

A hole cleaning and residue removing integrated device for building pile foundation construction

PendingCN122543444Areduce productionlow cost
This invention belongs to the technical field of building pile foundation construction equipment, and in particular, it is an integrated device for cleaning and removing slag in building pile foundation construction. It includes a base, with a fixed column connected to the upper surface of the base. A groove is formed on the left side of the fixed column. A servo motor is mounted on the top of the fixed column via a mounting bracket. A threaded rod is connected to the inner wall of the groove via a bearing. The top of the threaded rod is connected to the output end of the servo motor. This invention can detect the thickness of slag at the bottom of the hole in real time using a radar level gauge on the bottom of the lifting cylinder, and a camera can observe the bottom and wall of the hole in real time. The monitoring data is displayed in real time on the screen of the PLC control box. Workers can accurately grasp the cleaning effect without relying on experience or post-construction inspection. The PLC control box can automatically control the start and stop of the equipment according to a preset slag threshold, effectively avoiding the need for secondary operations due to insufficient cleaning or the waste of resources and delays caused by excessive cleaning, thus improving the controllability of construction quality.
Owner:NANJING HIGHER VOCATIONAL & TECH SCHOOL

Device for installing water level monitoring equipment

The utility model provides a device for installing water level monitoring equipment, which comprises a support frame and a connecting frame extending along the radial direction of the support frame, and the connecting frame is configured to allow relative fixation with the water level monitoring equipment. Wherein the supporting frame comprises a mounting block and an adjusting rod, the mounting block and a mounting surface are relatively fixed together, the adjusting rod is arranged on the mounting block and is perpendicular to the mounting block, the connecting frame comprises an adjusting part, and the adjusting part is arranged on the adjusting rod in a sleeving mode and is allowed to move along a path constructed by the adjusting rod; and the distance of the water level monitoring equipment relative to the mounting block is adjusted. By means of the mode, when the water level monitoring equipment needs to be maintained, the adjusting part can move to the proper position along the adjusting rod, then the connecting frame and the water level monitoring equipment arranged on the connecting frame move to the proper position, and therefore maintenance of the water level monitoring equipment is achieved. Therefore, tedious working procedures during maintenance of the water level monitoring equipment are avoided.
Owner:CHINA YANGTZE POWER

A connecting device for improving the installation pre-tightening force of a resin anchor rod and a construction method

ActiveCN116838391BImprove applicabilityMeet the needs of pushing stressAnchoring boltsCircular discStructural engineering
The application discloses a connecting device for improving resin anchor rod installation pre-tightening force and a construction method, which comprises an outer cylinder and an inner cylinder, the outer cylinder and the inner cylinder are on the same center axis, a piston is arranged between the hydraulic oil in the cavity of the inner cylinder and a limiting disc, the overflow valve, the back liquid valve mounted on the outer wall of the inner cylinder and the liquid injection and discharge valve on the wall of the outer cylinder are combined to realize resin anchor rod stirring and installation integrated operation. In the device, the hydraulic oil forms internal circulation to avoid loss, the oil pressure threshold of the device is adjustable, the device can match anchor rod drills with different thrust and torque and resin anchor rods with different specifications, has wide application range, is convenient to operate and has wide application prospect.
Owner:YUNNAN PHOSPHATE CHEM GROUP CORP +1

Quick dismounting structure of centrifugal pump

The utility model discloses a centrifugal pump quick dismounting structure, it belongs to pipeline connection technical field, and it solved the problem of complicated operation, low efficiency of connecting mode in prior art. It mainly includes two buckles, and the inside of buckle is equipped with recess, and the bottom of two buckles is hinged together, and the top of two buckles is connected through open-close structure, and the open-close structure includes lever, connecting piece and tension knob, and one end of connecting piece is connected with lever, and the other end is connected with tension knob, and the lever is equipped with limit block, and the lever is connected with connecting piece through limit block, and the limit block is equipped with pivot hole, and the pivot hole is equipped with eccentric shaft, and the eccentric shaft is arranged on one of the buckle, and the other buckle is equipped with limit platform, and the limit platform is matched with tension knob. The utility model discloses through bottom hinged and lever formula open-close structure, and the operator only needs to pull lever to complete the locking or release of buckle, and completely avoids the tedious procedure of tightening or loosening multiple bolts one by one.
Owner:SHANDONG FUTURE POWER GROUP CO LTD +1

Method for preparing Fmoc-Lys (R)-OH fragment peptide by solid phase method

PendingCN121949439Aavoid timeAvoid cumbersome proceduresPeptide preparation methodsFluid phaseSide chain
The invention relates to a method for preparing Fmoc-Lys (R)-OH fragment peptide by a solid phase method, and belongs to the technical field of peptide synthesis. According to the method, a solid-phase synthesis process route is adopted, 2-CTC lipid is taken as a solid-phase carrier, an initial material Dde-Lys-FMOC is adopted, any amino acid can be coupled to side chain amino groups in sequence, after coupling is completed, hydrazine hydrate is adopted for reduction removal of Dde and FMOC-0su cap exposure of amino groups, and finally, weak acid is adopted for cutting off full-protection peptide from resin, so that a target product crude peptide is obtained. The purity of the crude peptide prepared by the method reaches 95%, the purity can reach 99% or above through one-step extraction, the method avoids the problems of long liquid phase synthesis time and tedious procedures, and the product yield and the process stability are greatly improved.
Owner:SINOPEP ALLSINO BIOPHARMACEUTICAL CO LTD

Production method of winding structure wall pipe with pre-embedded optical fiber and pipe

PendingCN121821773AAchieve integrated moldingclosely connectedPipeline systemsRigid pipesFiberHot melt
The invention discloses a production method of a winding structure wall pipe with an embedded optical fiber and the pipe. The production method comprises the following steps: preparing a strip: coating the optical fiber with a raw material through an extruder, extruding the strip, cooling the strip and rolling the strip into a disc; the coiled strip is unwound, and the end of the strip penetrates through a heating sleeve and then is fixed to a first fixing ring; the coiled strip is translated in the axial direction of a pipe forming cage, the pipe forming cage rotates, the strip is spirally wound in the axial direction of the pipe forming cage, and the other end of the strip is fixed to a second fixing ring; closing the mold and performing hot melting; the upper mold body located above the pipe forming cage and the lower mold body located below the pipe forming cage are mutually closed, the upper mold body, the lower mold body and the pipe forming cage heat the joint part of the strip, and the spirally wound strip is hot-melted and mutually connected to form the pipe. The optical fiber wound on the outer wall of the pipe can early warn and accurately monitor the problems of leakage, deformation, cracking and the like of the pipe.
Owner:浙江中财管道科技股份有限公司

A shock absorber bushing tube uniform spraying treatment device

ActiveCN224462963UEquipped with automatic continuous feeding functionMove quickly and accurately toShock absorberPhysics
The utility model discloses a shock absorber bushing pipe even spraying treatment device, specifically relates to shock absorber bushing pipe spraying treatment technical field, including operation platform, the upper end surface of operation platform is fixedly connected with two support side plates respectively, the upper end surface fixedly connected with the top plate of two support side plates, be equipped with spraying assembly on the top plate. The utility model discloses a feeding structure is set up, makes spraying treatment device possess automatic continuous feeding function, when spraying, can one -time operation to multiple shock absorber bushing pipe, greatly improved the batch nature of operation, in the spraying process, when one bushing pipe completes spraying, can rapidly and accurately remove the unprocessed bushing pipe to the spraying position, need not manual frequent change single bushing pipe, effectively reduces the time loss and operating error because of replacement, not only has improved spraying efficiency significantly, also has guaranteed the continuity and stability of production process.
Owner:RONGPEIAN AUTO PARTS (YANCHENG) CO LTD

Civil construction supporting device

The invention belongs to the technical field of supporting devices, and particularly relates to a civil construction supporting device which comprises a lower-layer box type supporting device. The lower-layer box-type supporting device comprises side plates and first connecting assemblies. The two side plates are oppositely arranged, and the two sides of the two side plates are connected through first connecting assemblies correspondingly. The two folding rods are arranged at an interval from top to bottom; a limiting assembly is arranged between the folding rod located on the upper portion and the side plate. The limiting assembly comprises a reset plate, a limiting cylinder and a limiting pin, the limiting cylinder is fixedly connected with the side plate, the limiting pin is slidably connected with the limiting cylinder, a limiting spring is arranged between the limiting pin and the limiting cylinder, and a limiting hole matched with the limiting pin is formed in the end of the folding rod; the reset plate is fixedly connected with the sliding plate through the transverse plate. By designing a foldable box-type supporting device (an upper layer / a lower layer), two side plates, folding rods and a supporting assembly are integrated into an integral unit. When being stored or transferred, the device can be folded to be in a compact state; during supporting, linkage unfolding can be achieved through the lifting action.
Owner:SHANXI NO 8 CONSTR GRP

Temporary steel trestle steel pipe pile inserting and driving guide frame for water spanning tower construction and construction method

PendingCN121827330Aincrease the lengthReduce verticality deviationBulkheads/pilesPilot holeArchitectural engineering
The invention discloses a temporary steel trestle steel pipe pile inserting and driving guide frame for underwater spanning tower construction and a construction method, and relates to the technical field of steel trestle construction. Most existing guide frames are bailey beam modified frames, have the problems that steel pipe piles need to be lengthened for multiple times, a distribution beam construction platform cannot be provided and the like due to the fact that the existing guide frames are low in rigidity and located on the upper portions of bailey beams, and influence construction quality, efficiency and safety. The guide frame comprises an upper cross beam, vertical rods, a lower cross beam and a fence, and the upper cross beam and the lower cross beam are connected through the vertical rods to form a sunken operation platform; the lower cross beam exceeds the upper cross beam in length, a guide hole is formed in the extending part of the lower cross beam, and the guide frame is used for completing operations such as steel pipe pile positioning, inserting and driving, lengthening, pile top opening and distribution beam installation. Through the design of the sinking type platform, the length of a single-time hoisting pile is increased, the lengthening frequency is reduced, the sinking type platform does not need to additionally erect a platform, multi-procedure continuous operation is achieved, the construction efficiency, quality and safety are remarkably improved, and the construction cost is reduced.