Using method of automatic plastering machine for building
A plastering machine and construction technology, applied in construction, building construction, etc., can solve the problems of falling to the ground, waste of raw materials, etc., and achieve the effect of reducing the amount of use
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0035] like Figure 1~5 As shown, this embodiment includes the following steps:
[0036] (1) Continuously inject mortar into the feeding cavity through the feeding pipe;
[0037] (2) The drive assembly drives the first cam to first contact the side wall of the shifting plate, and then drives the lower section of the shifting plate to move towards the direction close to the discharge port, and at the same time, the vertical movement of the plastering box is in line with the level The push is carried out synchronously, and the quantitative mortar overflows from the discharge port and is applied to the wall through the plastering surface of the plastering box;
[0038] (3) The rotating shaft and the central shaft continue to rotate, the first cam is out of contact with the shifting plate, and the second cam rotates to contact with the upper section of the shifting plate, thereby driving the shifting plate to reset;
[0039] (4), repeating steps (2), (3), the first cam 19 and th...
Embodiment 2
[0045] like Figure 1~5 As shown, this embodiment is based on Embodiment 1. The drive assembly includes two main motors 31 and two auxiliary motors 32, and the two auxiliary motors 32 are arranged oppositely, and also include a The drive gear 34, the output ends of the two auxiliary motors 32 are respectively connected to the end faces of the drive gear 34, and the output ends of each of the main motors 31 move through the side wall of the adjustment chamber 30 and extend to the plastering box 7, and in The extension section of the output end of each main motor 31 is provided with a planetary gear, and two bevel gears 18 engaged with the planetary gears are provided on the central shaft 17, and two supporting gears are arranged oppositely in the adjustment chamber 30. Plate 35, two rows of hooks 33 are arranged on the side wall of the column 2, and the two rows of hooks 33 are respectively located on both sides of the toothed belt 3, between the two support plates 35 is provid...
Embodiment 3
[0048] like Figure 1~5 As shown, in this embodiment, on the basis of Embodiment 1, two guide holes 22 penetrating through the adjustment chamber 30 are opened on the base 9, and two guide columns 5 are vertically provided on the support frame 1, The guide column 5 moves through the guide hole 22, and a guide groove 6 equal to the guide column 5 is formed on the side wall of the guide column 5. The transverse section of the guide groove 6 is T-shaped. A guide block matching the guide groove 6 is fixed in the middle. The two guide posts 5 provided can increase the stability of the movement of the base 9 on the support frame 1 and prevent left and right swings when the base 9 moves, so as to ensure the effect of mortar coating on the wall.
[0049] Preferably, a plurality of universal wheels 10 are arranged at the bottom of the support frame 1, which can improve the mobility of the support frame 1 and facilitate construction personnel to transfer construction points.