Apparatus for plastering interior walls of buildings
An in-building and ash-filling technology, which is applied in the direction of building structure and construction, can solve the problems of plastering and wallboard mortar dripping, etc., and achieve the effect of reducing the usage amount, avoiding excessive mortar overflow, and maintaining stability.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] Such as Figure 1~7 As shown, this embodiment includes two rectangular support frames 1 formed by welding horizontal plates and vertical bars. The column 2 is covered with a plastering box 7, and the upper end of the plastering box 7 is open, and also includes a connecting assembly 15. The connecting assembly 15 includes a housing 41, ash filling box I16 and ash filling box II42 placed side by side. , the housing 41 is U-shaped and the direction of its opening 25 is consistent with the horizontal direction, the ash filling box II 42 is fixed in the U-shaped area of the housing 41, and the ash filling box I16 is slidably arranged inside the housing 41 and partially protrudes from the shell The open end of the body 41 is provided with openings 25 on the two horizontal sections of the housing 41, and the two adjacent vertical bars are placed in the openings 25, and the horizontal section of the housing 41 is connected to the ash filling box through the positioning pin 43...
Embodiment 2
[0042] Such as Figure 1~7 As shown, this embodiment is based on Embodiment 1. The drive assembly includes a drive gear 34 that cooperates with the toothed belt 3 , and the adjustment chambers 30 of the two plastering boxes 7 are oppositely arranged with Two support plates 35 and two auxiliary motors 32, the output ends of the two auxiliary motors 32 are respectively connected to the end faces of the drive gear 34, two rows of hooks 33 are arranged on the side wall of the column 2, and the two rows of hooks 33 Located on both sides of the toothed belt 3 respectively, a U-shaped locking plate 37 is arranged between the two support plates 35, pins 36 are respectively provided at both ends of the locking plate 37, and the two pins 36 respectively move through the two support plates 35 and then extend outwards, and an adjustment gear 38 is provided on the extension of the pin 36; in the initial state, the U-shaped opening 25 of the locking plate 37 is facing the toothed belt 3, T...
Embodiment 3
[0047] Such as Figure 1~7 As shown, in this embodiment, on the basis of Embodiment 1, bellows 27 are respectively fixed on the opposite side walls of the plastering box 7, and the bellows 27 and the shifting plate 13 face the The side wall of the rotating shaft 14 is connected. An organ cover 27 is respectively fixed on the opposite side walls of the plastering box 7, and the bottom of the chute 12 is in contact with the bottom of the chute 12 at the same time, so that both sides of the plastering plate 13 can achieve low-level sealing and isolation, preventing the plastering Mortar leakage occurred in box 7.
[0048] Wherein, the top of plastering box 7 is open, present embodiment is provided with pressing plate 4 at the open end of plastering box 7, and one end of pressing plate 4 is hinged with plastering box 7, and is provided with spring in plastering box 7, and spring Part protrudes from the upper surface of the plastering box 7, so that when the plastering box 7 move...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


