Unlock instant, AI-driven research and patent intelligence for your innovation.

A device automatic binding method and building management system

A building management system and equipment technology, applied in the field of communication, can solve problems such as long docking cycle, inability to automatically identify new access devices, cumbersome problems, etc., and achieve the effect of shortening the development cycle

Active Publication Date: 2022-06-21
GREE ELECTRIC APPLIANCES INC
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] An embodiment of the present invention provides a device automatic binding method and a building management system to solve the problem in the prior art that the building management system cannot automatically identify new access devices, resulting in a long and cumbersome docking cycle

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A device automatic binding method and building management system
  • A device automatic binding method and building management system
  • A device automatic binding method and building management system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0026] figure 1 is an architecture diagram of a building management system according to an embodiment of the present invention, such as figure 1 As shown, the whole system is divided into four layers: the device layer, the analysis layer, the configuration layer, and the interaction layer.

[0027] The equipment layer is used to manage the equipment connected to the building management system and realize the binding of the communication protocol with the equipment;

[0028] Specifically, the device layer includes a docking protocol frame, a status frame, a fault / alarm frame, a control frame, and an interaction module frame. The site needs hardware equipment connected to the building management system. The equipment communication protocol includes broadcast frames that need to be recognized by the building management system, protocol frames that can be converted by the building management system, and template frames that can automatically create an interactive interface.

[0...

Embodiment 2

[0036] figure 2 is a flowchart of a method for automatic device binding according to an embodiment of the present invention, such as figure 2 As shown, the method includes the following steps:

[0037] Step S201, between the building management system and the device newly connected to the network, automatically completes the protocol binding by binding the protocol frame and the standard protocol frame;

[0038] Step S202, in the case that the device includes the interactive template frame, the building management system receives the interactive template frame sent by the device, and assembles the interactive interface according to the interactive template frame;

[0039] Step S203, the building management system notifies the device to send all communication frames normally.

[0040] For the specific implementation of the above step S101, this embodiment provides a preferred implementation, that is, the building management system receives the broadcast frame sent by the de...

Embodiment 3

[0046] image 3 is the operation flow chart of the building management system according to the embodiment of the present invention, such as image 3 shown, the process includes:

[0047] 1) When a new hardware device is connected to the network, the hardware device needs to write a program according to the broadcast frame defined in advance by the same building management system.

[0048] 2) When the building management system receives the broadcast frame of the hardware device, it continues to initiate the request information of the binding protocol frame to the hardware device.

[0049] 3) The hardware device initiates the binding protocol frame (that is, the communication frame containing the binding protocol), and the building management system maps the binding protocol frame in the hardware device according to its own compatible standard frame structure, and maps the binding protocol frame to the Analyze and compare with the standard protocol frame, and finally encapsul...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a device automatic binding method and a building management system. Among them, the method includes: between the building management system and the equipment newly connected to the network, the protocol binding is automatically completed by binding protocol frames and standard protocol frames; when the equipment contains an interactive template frame, the building management system receives the information sent by the equipment. The interactive template frame is assembled according to the interactive template frame; the building management system notifies the device to send all the communication frames normally. Through the present invention, when a new device is connected to the building management system, the device can be automatically discovered, and the corresponding device protocol can be automatically assembled with a configured interactive interface, and it is also convenient for customers to customize the front-end interactive interface, shortening the development cycle.

Description

technical field [0001] The present invention relates to the field of communication technologies, and in particular, to an automatic device binding method and a building management system. Background technique [0002] The building management systems currently on the market need to be developed for the newly connected hardware devices according to the hardware private protocol, or to be developed by secondary programming. If the protocol between the building management system and the hardware equipment is not connected, the equipment cannot be controlled. For newly connected hardware devices, the development of the front-end interaction layer is also required. As a result, when each hardware device is connected, it takes a lot of time to connect the communication protocol, test the correctness of the communication, and some need to customize the control interface of the hardware, and the overall development cycle is long. [0003] Aiming at the problem in the prior art that...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): H04L67/12H04L69/08H04L69/22
CPCH04L67/12H04L69/08H04L69/22
Inventor 张振宇申伟刚周丙相裘文波
Owner GREE ELECTRIC APPLIANCES INC