A kind of steel structure construction and installation mobile temporary support structure

A temporary support and mobile technology, applied in the direction of buildings, pillars, building structures, etc., can solve the problems of wasting manpower, affecting the beauty of the steel structure, the stability of the steel structure, and the low efficiency of beam steel installation, so as to achieve the effect of improving installation efficiency

Active Publication Date: 2021-12-17
宁波市天一建筑设计有限公司
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The steel structure in the prior art usually builds steel columns and steel trusses in advance and then builds beams. It is often necessary to install multiple groups of beams on the steel trusses. Therefore, a mobile temporary support structure is needed for the convenience of beams. However, in the prior art, the installation position of the beam steel is generally measured manually and then the beam steel is installed on the steel truss. error, when multiple groups of beam steel are installed at the same time, it often leads to uneven installation, which affects the appearance of the steel structure and the stability of the steel structure after installation

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A kind of steel structure construction and installation mobile temporary support structure
  • A kind of steel structure construction and installation mobile temporary support structure
  • A kind of steel structure construction and installation mobile temporary support structure

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0024] Embodiments of the present invention will be described below with reference to the drawings. In this process, in order to ensure the clearness and convenience of the description, we may exaggerate the size of the width or constituent elements of the middle line.

[0025] In addition, the terms in the following are defined based on the functions in the present invention, and can be different depending on the user, the user's intention or convention. Therefore, these terms are defined based on the entire contents of this specification.

[0026] like Figure 1 to 9 As shown, a steel structure is built to install a moving temporary support structure, including mounting mechanism 1, mounting rod 2, a lifting mechanism 3, a thread lifting rod 4, and a fixing mechanism 5, and the left and right ends of the mounting rod 2 are fixedly mounted. There is a mounting mechanism 1, and the surface is equipped with a plurality of sets of lifting mechanisms 3, and each set of surfaces of the...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a mobile temporary support structure for building and installing a steel structure, which includes a mounting mechanism, a mounting rod, a lifting mechanism, a threaded lifting rod and a fixing mechanism. The surface is equidistantly equipped with multiple groups of lifting mechanisms, and the surface of each group of lifting mechanisms is vertically installed with threaded lifting rods, and the top of each group of threaded lifting rods is equipped with a fixing mechanism. The invention installs it on the surface of the steel column , so that it can be used as a guide to install the beam steel on the steel truss, saving time and effort, and improving the installation efficiency of the beam steel; the two sets of lifting mechanisms can adjust the height of the lifting rod synchronously without manual measurement. It solves the problem that multiple groups of beams and steels are installed at the same time due to measurement errors, which often leads to uneven installation; finally, after the beams and steels are installed, the invention can be quickly disassembled from the surface of the steel column without occupying additional space.

Description

Technical field [0001] The present invention relates to the field of steel structure mounting techniques, and in particular, to a steel structure construction mounting mounting mounted temporary support structure. Background technique [0002] The steel structure is a structure consisting of steel materials and is one of the main building structures. The structure is mainly composed of beam steel, steel columns, steel truss, and other components made of steel and steel plates. Welds, bolts or rivets are typically used between components or components, in which Liang Steel is mainly mounted in maintenance. [0003] The steel structure in the prior art will generally build steel columns and steel truss and build beam steel. It is often necessary to mount multi-group beam steel on the steel truss, so there is a need for mobile temporary support structure for convenient beam steel. The installation, however, in the prior art will generally use the mounting position of Beamang steel i...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E04G21/16E04G21/18E04G25/06
CPCE04G21/16E04G21/1841E04G25/065
Inventor 赵玉玲许辉
Owner 宁波市天一建筑设计有限公司