Treatment and construction process for tunnel to pass through super-huge karst cave with water cavity

A kind of construction technology and super-large technology, applied in tunnels, tunnel linings, drainage and other directions, can solve the problems of large construction disturbance of surrounding rock, complicated construction technology, long construction time, etc., to achieve less construction difficulty, less impact, and lower construction costs. and duration effect

Inactive Publication Date: 2020-11-06
陕西交控资产管理有限责任公司
View PDF7 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The purpose of the present invention is to provide a low-cost, environmentally-friendly and safe treatment and construction process for tunnels passing through super-large water-filled caverns, which avoids the construction scene of large-scale machinery in the tunnel, and can systematically solve the construction of existing tunnels crossing super-large caves Technical problems such as complex process, long construction time, large disturbance to surrounding rock construction, cross-construction, monitoring and measurement

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Treatment and construction process for tunnel to pass through super-huge karst cave with water cavity

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0030] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0031] The present invention provides a treatment and construction process for a tunnel passing through a super-large water cavity karst cave, which includes the following steps:

[0032] Step 1: Protect the top of the cave to prevent rockfall on the top of the cave from posing a safety threat to the construction workers at the bottom of the cave. (1) Construction of temporary passive protective net, adopting a protective form similar to active protective net; (2) Ground anchor links are used on both longitudinal sides of the karst cave. The embedded length of the rod is 4.5 meters, and the top of the anchor rod is anchored with C30 reinforced concrete; (3) An elbow is installed at the end of the Φ22 anchor rod to connect firmly with the steel wire rope, and a protective net is set on the steel wire rope (the protective net includes steel wire rope net,...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a treatment and construction process for a tunnel to pass through a super-huge karst cave with a water cavity. The treatment and construction process includes the steps that firstly, the top of the karst cave is protected; secondly, karst cave operating personnel transport devices for construction; thirdly, escape channels are arranged; fourthly, a karst cave water outlet retaining wall is constructed; sixthly, roadbed filling is carried out; seventhly, a drainage system is established; eighthly, a transverse drainage tunnel is constructed and drained to a drainage drainage tunnel communicating with the outside world; ninthly, backfilling body settlement monitoring is conducted; tenthly, after roadbed filling is completed, compaction and pre-compaction are carried out; eleventhly, preliminary bracing construction of the karst cave top begins; twelfthly, steel bar concrete strip foundations are constructed; thirteenthly, an open tunnel lining is constructed, anda light weight foam concrete buffer layer is filled between the top of the karst cave and the outer side of the lining; and fourteenthly, backfilling body settlement monitoring is conducted. The technical problems of complicated construction processes, long construction time, large disturbance to surrounding rock construction, cross construction and monitoring measurement of existing tunnels passing through super-huge karst caves can be systematically solved.

Description

technical field [0001] The invention belongs to the technical field of tunnel construction, and in particular relates to a treatment and construction process for a tunnel passing through an extra-large karst cave with a water cavity. Background technique [0002] When the tunnel passes through the karst area, it may encounter large karst caves, underground rivers or pipeline flows. Such geology has a certain impact on the overall stability of the surrounding rock and stress distribution and release. The engineering method with small disturbance to the surrounding rock structure of the karst cave and fast construction is particularly important. [0003] By reviewing relevant literature and patents, it is found that during the excavation of long tunnels, it is rare to directly pass through super-large water-cavity caves with a span of 34 meters and a depth of more than 38 meters, and the cave roof is higher than the tunnel roof. Some methods for the treatment of tunnels passi...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & AuthorityApplications(China)
IPC IPC(8): E21D19/04E21F13/00E21D11/15E21D20/00E21F16/02E21F11/00E21D11/10E21D11/18E21D11/08E01C3/00G01C5/00
CPCE21D19/04E21F13/004E21D11/152E21D20/00E21F16/02E21F11/00E21D11/10E21D11/18E21D11/08E01C3/00G01C5/00
Inventor王学礼林哲赵正明程坤胡光明白茗文马凯陆纪川苏宁
Owner陕西交控资产管理有限责任公司