A kind of subway tunnel track bed and drainage ditch structure reinforcement method

A technology for structural reinforcement and drainage ditch, which is applied in tunnels, drainage, tunnel lining, etc., can solve the problems that epoxy materials cannot be effectively and quickly solidified, cannot quickly form ballast bed support and reinforcement, withstand vibration and extrusion, and have long maintenance periods. , to achieve the effect of not affecting the operation, saving manpower and material resources, and fast solidification

Active Publication Date: 2022-07-08
SHANGHAI RAIL TRANSIT MAINTENANCE SUPPORT
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] One is that the grout injected in this patent is ordinary cement without aggregate, the maintenance period is long, and the compressive strength can only reach about C35;
[0006] The second is that the cement slurry is not a self-leveling material, and cannot complete the full filling and compaction of the underground hoisting empty position by itself;
[0007] The third is that the epoxy material cannot be effectively and rapidly solidified under the low temperature condition at the bottom of the tunnel, and cannot quickly form support and reinforcement for the ballast bed and withstand vibration and extrusion during the short construction skylight period

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A kind of subway tunnel track bed and drainage ditch structure reinforcement method
  • A kind of subway tunnel track bed and drainage ditch structure reinforcement method
  • A kind of subway tunnel track bed and drainage ditch structure reinforcement method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0045] The present invention will be described in detail below with reference to the accompanying drawings and specific embodiments. This embodiment is implemented on the premise of the technical solution of the present invention, and provides a detailed implementation manner and a specific operation process, but the protection scope of the present invention is not limited to the following embodiments.

[0046] A kind of subway tunnel track bed and drainage ditch structure reinforcement method, such as Figure 5 ,Specifically:

[0047] Judging the disease degree of the track bed 1 and the drainage ditch 7, the disease degree includes serious disease and general disease;

[0048] The process of judging the degree of disease is as follows: figure 1 and Figure 4 , the track bed 1, the sleeper 4 and the rail 3 are arranged in turn, and a high-power electric hammer is used to open a number of probe holes 2 between the sleepers 4 at the center of the track bed 1, and the distanc...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a method for reinforcing the structure of a track bed and a drainage ditch of a subway tunnel, which specifically includes: judging the disease degree of the track bed and the drainage ditch, the disease degree includes serious disease and general disease, and if the disease degree is a general disease, chisel out loose structures, Arrange grouting holes in the track bed and drainage ditch according to the plum-blossom pile shape, and grouting into the grouting holes on the track bed and drainage ditch. If the disease degree is serious, the loose structure shall be chiseled, and the space cleared on the track bed shall be filled with dilute and quick filling. Hard castable, the space cleared on the drainage ditch is shaped with PVC half-pipe and double-speed cement, several pouring holes are opened at the center of the track bed, grouting holes are arranged in the drainage interval, and the pouring holes are poured into the pouring holes successively. Hard castable and thick fast hard castable, and then pour epoxy resin slurry into the grouting hole. Compared with the prior art, the present invention has the advantages of saving manpower and material resources, high construction efficiency, and no influence on operation.

Description

technical field [0001] The invention relates to the field of tunnel construction, in particular to a method for reinforcing a subway tunnel track bed and a drainage ditch structure. Background technique [0002] Subway lines are becoming more and more popular in urban traffic in my country. There are many tunnel railways. With the passage of operation time, train load and the influence of groundwater, the trackbed of tunnel railways will suffer from many diseases, such as the cracking of the drainage ditch itself, the drainage ditch and the overall track bed. Or the joint part of the segment is cracked, the overall track bed structure and the track bed and the tunnel segment arch bottom block are separated, and the disease can cause the sleeper to break away from the track bed and the overall track bed to break, endangering the safety of the train. Therefore, it is necessary to reinforce the track bed and the drainage channel. [0003] The prior art also provides some soluti...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21D11/10E21D11/00E21F16/02E01B1/00E01B27/00
CPCE21D11/105E21D11/003E21F16/02E01B1/00E01B27/00Y02A30/60
Inventor 丁志勇俞嘉俊陆世杰赵莹
Owner SHANGHAI RAIL TRANSIT MAINTENANCE SUPPORT
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products