Power switch series connection scheme based on TSP algorithm
A power switch and algorithm technology, applied in special data processing applications, geometric CAD, design optimization/simulation, etc., can solve the problem of engineers spending a lot of time and energy, the time of turning on or wake-up is not the shortest, and the time of turning on or wake-up of the power switch is different. , to achieve the effect of improving serial connection efficiency and improving turn-on and wake-up time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
no. 1 example
[0036] see figure 1 , a kind of power switch series connection method based on TSP algorithm in the embodiment of the present invention, at least comprises the following steps:
[0037] S101. Obtain the physical coordinates of each power switching device;
[0038] S102. Perform the shortest path calculation between the physical coordinates of each power switching device according to the LKH algorithm;
[0039] S103. Complete the serial connection of the power switching devices according to the result of the shortest path calculation.
[0040] It should be noted that the present invention is mainly based on the traveling salesman problem, that is, the open source algorithm LKH (Lin-Kernighan-Helsgaun) method of the TSP problem, to find the shortest path, efficiently complete the series connection of power switches, and ensure that the specific power switch arrangement In the following mode, the power switches are turned on in series or the wake-up time is the shortest. The L...
no. 2 example
[0048] see Figure 7 , a TSP algorithm-based power switch series device 200 provided by an embodiment of the present invention includes: a physical coordinate acquisition module 201, an algorithm processing module 202, and an execution module 203;
[0049] Wherein, the physical coordinate acquisition module 201 is configured to acquire the physical coordinates of each power switching device;
[0050] The algorithm processing module 202 is used to perform the shortest path calculation between the physical coordinates of each power switching device according to the LKH algorithm;
[0051] The execution module 203 is configured to complete the serial connection of the power switch devices according to the result of the shortest path calculation.
[0052] In a certain embodiment of the present invention, the acquiring the physical coordinates of each power switching device specifically includes: grabbing the physical coordinates of each power switching device, and defining the co...
no. 3 example
[0055] The embodiment of the present invention also provides a terminal device, including:
[0056] One or more processors; memory, coupled with the processor, for storing one or more programs; when the one or more programs are executed by the one or more processors, the one or more A plurality of processors implement the TSP algorithm-based method for connecting power switches in series according to any one of claims 1 to 3.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com