High-rise building construction system and mounting and using method thereof
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- CHINA MCC20 GRP CORP
- Publication Date
- 2021-03-02
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to a high-rise building construction system and its installation and use method, and belongs to the technical field of construction engineering equipment manufacturing and its installation and use method. Background technique
[0002] With the development of urban construction, there are more and more high-rise buildings, and the architectural forms are becoming more and more diverse. At this stage, the construction industry not only retains the traditional cast-in-place reinforced concrete structures, but also As an important way to promote the industrialization of construction, the cast-in-place construction has huge advantages over the cast-in-place construction method in terms of saving resources, reducing energy consumption, protecting the environment, and improving the quality of buildings. It will be one of the main forms of future buildings.
[0003] In the construction process of existing high-rise buildings, no matter wh...