Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

High-rise building construction system and mounting and using method thereof

A technology of high-rise buildings and subsystems, applied in the field of high-rise building construction systems and their installation and use, can solve problems such as construction site confusion, worker shortage, and difficulty in unified scheduling, and achieve the goals of improving work efficiency, reducing operators, and improving the working environment Effect

Active Publication Date: 2021-03-02
CHINA MCC20 GRP CORP
View PDF7 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] Although in recent years, due to the development of industry and science and technology, various construction machinery has been updated quickly, which has greatly improved work efficiency, but the main body of many construction operations still relies on manual work, requiring a large number of construction personnel to work on site and in an open-air environment. Among them, it is greatly affected by the natural environment, and with the improvement of living standards, people have higher requirements for the working environment. More and more people are discouraged, and the shortage of workers in the construction industry is becoming more and more serious. The traditional construction methods can no longer meet the development requirements of the construction industry. There is an urgent need for technological innovation in construction methods in order to ensure construction quality and improve construction efficiency. Under the premise of reducing the number of on-site construction workers and improving the working environment of construction
[0005] In the construction process of high-rise buildings, the lifting and transportation of building materials and building components are all completed by tower cranes. In order to meet the construction needs, it is usually necessary to build multiple tower cranes around the building. Each tower crane works independently and requires construction personnel. On-site operation command, the construction site is relatively chaotic, it is not easy to carry out unified scheduling, and it is not easy to realize automatic and intelligent construction through computer program control and network IoT

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • High-rise building construction system and mounting and using method thereof
  • High-rise building construction system and mounting and using method thereof
  • High-rise building construction system and mounting and using method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0179] This embodiment provides a high-rise building construction system used for high-rise building construction.

[0180] Such as figure 1 A schematic diagram of a three-dimensional structure of a high-rise building construction system in use provided by an embodiment of the present invention, figure 2 The schematic diagram of the planar structure of a kind of high-rise building construction system provided by the embodiment of the present invention is as follows:

[0181] A high-rise building construction system comprising:

[0182] Self-climbing support subsystem, fixed track truss subsystem and mobile truss operation subsystem;

[0183] The self-climbing support subsystem includes at least four independent self-climbing support structures 100;

[0184] The self-climbing support structure 100 is respectively installed on the supporting base (not shown in the figure) supporting the self-climbing support structure or on the main structure wall 400 of a high-rise building...

Embodiment 2

[0255] This embodiment provides a method for installing and using a high-rise building construction system used for high-rise building construction.

[0256] In this embodiment, the high-rise building construction system includes a self-climbing support subsystem, a fixed track truss subsystem and a mobile truss operation subsystem, and the self-climbing support subsystem includes a self-climbing support structure. The self-climbing support structure includes a load-bearing structure, the fixed track truss subsystem includes a fixed track truss structure, and the mobile truss operation subsystem includes a mobile truss and an operating device.

[0257] The installation and use method of the high-rise building construction system provided in this embodiment includes the installation and use of the self-climbing support structure in the first stage and the second stage, as well as the installation and use of the fixed track truss subsystem and the mobile truss operation subsystem...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a high-rise building construction system and a mounting and using method thereof. The high-rise building construction system comprises a self-climbing supporting subsystem, a fixed rail truss subsystem, and a movable truss operation subsystem; the fixed rail truss subsystem is installed on the self-climbing supporting subsystem; and the movable truss operation subsystem isinstalled on the fixed rail truss subsystem. Therefore, the construction system with a rectangular area is built above a high-rise building, the requirements for hoisting, conveying and constructing building materials and building elements during high-rise building construction can be met through the system, and a plurality of tower cranes do not need to be built; and unified scheduling and intelligent management can be performed on the whole system and each specific operation device through computer program control and network Internet of Things, so that the automation and the intelligence ofbuilding construction are realized, field construction personnel are reduced, the working efficiency is improved, and the operation environment is improved. The high-rise building construction systemis unique in design thought and good in adaptability and expansibility, can work around the clock, and has great popularization and application value.

Description

technical field [0001] The invention relates to a high-rise building construction system and its installation and use method, and belongs to the technical field of construction engineering equipment manufacturing and its installation and use method. Background technique [0002] With the development of urban construction, there are more and more high-rise buildings, and the architectural forms are becoming more and more diverse. At this stage, the construction industry not only retains the traditional cast-in-place reinforced concrete structures, but also As an important way to promote the industrialization of construction, the cast-in-place construction has huge advantages over the cast-in-place construction method in terms of saving resources, reducing energy consumption, protecting the environment, and improving the quality of buildings. It will be one of the main forms of future buildings. [0003] In the construction process of existing high-rise buildings, no matter wh...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E04G3/20E04G5/00E04G5/04E04G21/16E04G21/04B66C11/04B66C5/00B66C9/14B66C13/00G06F30/13
CPCE04G3/20E04G5/00E04G5/007E04G5/04E04G5/046E04G21/162E04G21/16E04G21/04B66C11/04B66C5/00B66C9/14B66C13/00G06F30/13E04G2005/008
Inventor 康星孙千伟
Owner CHINA MCC20 GRP CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products