Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Blister sounding pipe energy pile bridge deck deicing system and construction method thereof

A technology of energy piles and acoustic tubes, applied in bridges, sheet pile walls, geothermal energy, etc., can solve the problems of large power consumption and great influence of road surface conditions, and achieve long service life, low cost, and later labor and maintenance The effect of low cost

Pending Publication Date: 2021-03-05
HENAN POLYTECHNIC UNIV +1
View PDF2 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, this method easily affects the normal operation of road traffic; and is greatly affected by road conditions; it consumes a lot of power

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Blister sounding pipe energy pile bridge deck deicing system and construction method thereof
  • Blister sounding pipe energy pile bridge deck deicing system and construction method thereof
  • Blister sounding pipe energy pile bridge deck deicing system and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0031]As shown in the figure, a plastic-absorbing acoustic tube energy pile bridge deck deicing system includes an energy pile foundation 1, a cap at the top of the energy pile, and a bridge deck heat exchange system 4, which are arranged on the energy pile foundation 1 and the cap And the heat transfer pipe 2 in the bridge deck heat exchange system 4 also includes a multifunctional heat collector water pump system 3 communicated with the heat transfer pipe 2. The measuring tube 21 and the PE-RT tube 22 located in the cap platform and bridge deck heat exchange system, this device melts snow and deices the bridge deck in winter, since the energy piles are buried underground, the 1-5°C circulating fluid in the collector The geothermal energy of the acoustic tube energy pile is heated to 12-16°C, and the bridge deck temperature can be deiced and snowed as long as the temperature of the bridge deck is above 0°C; the energy pile foundation 1 is equipped with a steel reinforcement ca...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention belongs to the technical field of civil construction, and particularly discloses a blister sounding pipe energy pile bridge deck deicing system and a construction method thereof. The blister sounding pipe energy pile bridge deck deicing system comprises an energy pile foundation and bearing platform structure, a bridge deck heat exchange system, a multifunctional heat collector waterpump system and a heat transfer pipe. According to the invention, the existing cast-in-place pile blister sounding pipe is used as an energy pipe, the bottom is communicated through a U-shaped connector to form the energy pile, heat conduction liquid flows into the energy pile from the multifunctional heat collector, flows to the bridge deck slab after heat exchange and melts ice and snow on thebridge deck, and the purpose of removing ice and snow is achieved. The system is suitable for bridges with the foundation being a pile foundation, capable of removing ice and snow on bridge decks by utilizing geothermal resources, long in service life, low in construction cost, and low in later-period labor and maintenance cost, achieves energy conservation and environmental protection, and is a new green building technology.

Description

technical field [0001] The invention belongs to the technical field of civil engineering, and in particular relates to a deicing system and a construction method for a plastic-absorbing acoustic measuring tube energy pile bridge deck. Background technique [0002] At present, the bridge deck deicing methods are mainly salt spraying and mechanical deicing. Using salt for bridge deck deicing will accelerate the corrosion of the bridge structure and threaten the overall stability of the structure. The chlorides in it will cause cumulative corrosion of bridge facilities. , and more and more maintenance and repair processes will not only increase the cost but also cause a vicious cycle for the long-term work of the bridge. The oxidation of the steel bar under the influence of chloride will cause the cross-sectional area of ​​the steel bar to become smaller and the stress of the steel bar will increase. [0003] Shallow geothermal energy is a clean and sustainable energy source wi...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E01C11/26E01D19/00E02D33/00E02D27/14E02D5/34F24T10/15E01D101/26
CPCE01C11/26E01D19/00E02D33/00E02D27/14E02D5/34F24T10/15E01D2101/26E02D2600/20Y02E10/10
Inventor 任连伟韩志攀霍继炜翟国政高宇甲李俊杰陈金权胡魁程天富焦继伟朱栋余斌王帅淇张文明于琦
Owner HENAN POLYTECHNIC UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products