A method for loading and connecting nodes of foundation piles
A technology of node connection and connection method, which is applied in the test of foundation structure, foundation structure engineering, construction, etc., can solve the problems of uncontrollable internal force, uneven distribution, waste of foundation pile materials, etc., and achieve the effect of reducing the difficulty of structural design
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0061] see figure 1 , the invention provides a method for loading and node connection of foundation piles, comprising
[0062] 101. Connect the superstructure to the foundation pile in a first connection manner, so that the superstructure is in a movable state relative to the foundation pile, and apply a first load on the superstructure.
[0063] In this embodiment, the foundation pile 20 refers to a foundation or a pile foundation, etc., which is subjected to axial force, shear force, bending moment and the like. The superstructure 10 can be a structure such as a beam, column or plate connected with foundation piles.
[0064] Further, for the convenience of actual construction, the first connection method may be a bolt connection or a plug-in setting material (such as concrete) pouring connection.
[0065] Please also refer to figure 2 , the first optional implementation manner, the first connection method is bolt connection, then in the above step 101, the following step...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com