Technological method for raising toughness and hardening layer depth of heavy truck axle shaft
A technology of hardened layer depth and heavy-duty vehicles, which is applied in the field of heat treatment, can solve problems such as shaft diameter fillet fracture, failure to guarantee the use of half shafts, and affect the quality of the vehicle, achieving stable performance, increased costs, and easy operation.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0018] Embodiment 1: The steps are as follows: firstly, the material is blanked, and the material of the half shaft 1 is 42CrMo; forging is carried out on a flat forging machine; the blank is subjected to quenching and tempering treatment on a heat treatment production line, and its process parameters: quenching temperature is 880 ° C, heating time 160 minutes, the quenching medium is diesel oil, the tempering temperature is 610°C, the heating time is 180 minutes, and then water cooling; CNC machine tool is used for machining, half shaft diameter 58mm; medium frequency induction quenching, using 2500HZ, 100KW quenching machine tool, Its process parameters: the power output power is 68KW, the frequency is 1700HZ, the moving speed of the workpiece is 2.1mm / s, the quenching temperature is 890°C, it is cooled by 10% Jinyu quenching fluid, and then the disk surface is heated statically for 12s. The water time is 2s; when the semi-shaft is quenched in the induction coil, the surface...
Embodiment 2
[0019] Embodiment 2: The method steps are the same as in Embodiment 1, except that the quenching and tempering process parameters are that the quenching temperature is 850° C., the heating time is 140 minutes, the quenching medium is diesel oil, the tempering temperature is 560° C., and the heating time is 180 minutes. Minutes, then water cooling; medium frequency induction hardening, use 2500HZ, 100KW quenching machine tool, its process parameters: power output power is 66KW, frequency is 1680HZ, workpiece moving speed is 1.9mm / s, quenching temperature is 890°C, using 12% Jinyu The quenching liquid is cooled, and then the plate surface is heated statically, the time is 15s, and the delayed water spraying time is 2s; when the half shaft is quenched in the induction coil, the surface gap between the induction coil and the half shaft rod is 7mm, and the induction coil is close to the flange. The gap between the plane of the disc and the plane of the flange in the vertical directi...
PUM
Property | Measurement | Unit |
---|---|---|
hardness | aaaaa | aaaaa |
hardness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com