Double end testing method in power transmission line longitudinal difference protection
A technology of longitudinal difference protection and testing method, which is applied in the field of electricity, can solve the problems of seldom used and cumbersome test operation, and achieve the effect of convenience, good economy and huge space for popularization and application
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] Below in conjunction with accompanying drawing and the present invention is described in further detail.
[0020] Please refer to the flow chart of the double-ended test method in Figure 1. First, select the "double-ended test" control item in the protection device to put into the double-ended test function, and then sample the voltage and current on both sides to obtain the voltage shown in Figure 2 Waveform diagram, where Uma is the a-phase voltage on this side, Una is the a-direction voltage on the other side, and θ is the phase difference of the voltage phasors on both sides. Then compare the voltages Uma, Umb, Umc and Una, Unb, Unc on both sides with a specific threshold value (set value), if both are larger than the specific threshold value, calculate the phase angle difference θ of the voltage phasors on both sides , otherwise return and continue sampling. After calculating the phase angle difference θ, shift the phase of the voltage phasor on the opposite side ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com