IPMI subsystem and single chip power on method
A subsystem and single board technology, applied in the transmission system, digital transmission system, electrical components, etc., can solve the problems of equipment availability and reliability reduction, and achieve the effect of improving availability and reliability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0041] In the IPMI subsystem of the prior art, the power management module in the IPMC handles the power-on / off process of the ATCA board and the power control of the board according to the state transition and operation process stipulated in the PICMG specification. Because the PICMG specification stipulates that the ATCA board can be powered on only after the master node ShMC responds to the activation request and sends an activation command to activate the ATCA board. Therefore, there is no master node ShMC on the chassis, or the master node ShMC exists but cannot manage the slave nodes. In the case of IPMC, the board cannot be powered on and work.
[0042] For this reason, the present invention aims at this problem and improves the IPMC and ShMC, so that the ATCA single board can also be powered on and work when there is no main node ShMC or the main node ShMC exists but cannot be managed. For the convenience of description, in the present invention, when there is no maste...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com