Method and system for scheduling resources, evolved node B (eNB) and relay node (RN)
A technology for resource scheduling and relay nodes, which is applied in store-and-forward switching systems, network planning, electrical components, etc., can solve problems such as resource conflicts, and achieve the effect of avoiding resource conflicts.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0031] Aiming at the problems existing in the prior art, the present invention proposes a brand-new resource scheduling scheme: before the RN initially accesses the network and before the actual communication starts, the eNB configures the resources allocated to the RN for backhaul link uplink The transmitted uplink subframe is notified to the RN, so that in the subsequent process, the RN does not perform uplink scheduling on the UE within the configured uplink subframe, thereby avoiding resource conflict.
[0032] Additionally, using figure 1 Although the manner shown can solve the interference problem, it is not clear how the RN knows which subframe to use as the MBSFN subframe in the prior art. In the solution of the present invention, it may be stipulated that the eNB configures the downlink subframes for downlink transmission of the backhaul link for the RN, and notifies the RN, and then the RN configures the downlink subframes as MBSFN subframes in the existing manner. ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 