Method and system for backward managing parameters of base station
A base station and parameter technology, which is applied in the field of reverse management of pico base station parameters, can solve the problems of no pico base station management scheme, difficult management, and a large number of configurations, and achieve the effect of automatic management.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
example 1
[0074] Example 1: Due to the dynamic needs of the process of reverse reconstruction and configuration of base station parameters, as long as there is a change in the base station parameters of the base station, the parameters must be managed, such as image 3 As shown, the implementation process of base station parameter change reporting includes the following steps:
[0075] Step 501, the base station accesses and generates new parameters; transfer to step 504.
[0076] Step 502, the base station quits the service and deletes the parameters; go to step 504.
[0077] Step 503, base station personalized parameter modification; transfer to step 504
[0078] In step 504, the BSC generates a corresponding synchronization update request according to the current state of the parameter change of the base station.
example 2
[0079] Example 2: The situation where the reporting is realized by adopting the incremental reporting method or the full reporting method. Such as Figure 4 As shown, the implementation process of BSC adopting different reporting methods includes the following steps:
[0080] Step 601, the BSC caches the data in the synchronization update request.
[0081]Step 602, judge whether the local buffer area is full, if yes, go to step 604; otherwise, it means that the long-term link problem between BSC and OMCR hinders the acquisition of base station parameters, then go to step 603.
[0082] Step 603: Report the synchronous update request to the OMCR in an incremental reporting manner.
[0083] Step 604: Report the full parameter request to the OMCR in a full report manner.
example 3
[0084] Example 3: OMCR updates base station parameters, such as Figure 5 As shown, the updated implementation process includes the following steps:
[0085] Step 701 , judging whether the reporting method is an incremental reporting method, if yes, execute step 702 ; otherwise, proceed to execute step 703 .
[0086] Step 702. Determine whether the current base station parameter change status in the synchronization update request is: the base station exits the service and deletes the parameters. If yes, proceed to step 704; otherwise, proceed to step 705.
[0087] Step 703 , obtain a list of all base stations managed by the current BSC, and proceed to step 705 .
[0088] Step 704, the OMCR clears the base station parameters of the corresponding base station, updates the local database and displays it.
[0089] Step 705, the OMCR sends a base station parameter request corresponding to the base station to the BSC.
[0090] In step 706, the BSC reports the requested base stati...
PUM

Abstract
Description
Claims
Application Information

- R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com