Power transmission and transformation project schedule management system and method for power system

A schedule management and power system technology, applied in the field of power transmission and transformation engineering

Inactive Publication Date: 2011-03-23
BEIJING FOREVER TECH
View PDF0 Cites 15 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Due to the unique and distinctive management characteristics of the schedule management of power transmission and transformation projects, the schedule management system is required to have functional characteristics such as adapting to these characteristics. Realize the refinement and multi-dimensional management of power transmission and transformation project progress

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Power transmission and transformation project schedule management system and method for power system
  • Power transmission and transformation project schedule management system and method for power system
  • Power transmission and transformation project schedule management system and method for power system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0016] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0017] Such as figure 1 As shown, it is a schematic structural diagram of a power transmission and transformation project progress management system for a power system according to an embodiment of the present invention. The power transmission and transformation project progress management system for a power system includes:

[0018] A progress sub-item management unit 11, used to organize and store project attribute information of the power transmission and t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides power transmission and transformation project schedule management system and method for a power system. The power transmission and transformation project schedule management system for a power system comprises a schedule item management unit, a loop management unit, a pole tower management unit, a section dividing management unit, a plan compiling unit, a schedule filling and reporting unit and a schedule calculating unit, wherein the schedule item management unit is used for organizing and storing the item attribute information of a power transmission and transformation project schedule; the loop management unit is used for storing the loop attribute information of a power transmission line; the pole tower management unit is used for organizing and maintaining power transmission line pole tower attribute information and the relation information of a loop; the section dividing management unit is used for storing a line erecting section and attribute information thereof of a power transmission line project; the plan compiling unit is used for automatically finishing the compilation of a project plan according to the project scale and the voltage grade; the schedule filling and reporting unit is used for filling and reporting the plan and practical information of the schedule as well as result information thereof; and the schedule calculating unit is used for providing querying, collecting and calculating services for the plan information, practical finishing information and successful information of the schedule. The invention can realize refined and multi-dimensional management on the power transmission and transformation project schedule.

Description

technical field [0001] The invention relates to a power transmission and transformation project in a power system, in particular to a system and method for managing the progress of a power transmission and transformation project in a power system. Background technique [0002] The progress management of power transmission and transformation projects is the core key content of the project management of power transmission and transformation enterprises, and the main line of the entire project management. Quality, safety, materials, cost, process data and many other aspects are inextricably linked with the progress. How to manage the entire progress process and related businesses reasonably and comprehensively is a major challenge for all management systems involved in power transmission and transformation projects. Due to the unique and distinctive management characteristics of the schedule management of power transmission and transformation projects, the schedule management s...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/00G06Q50/00G06Q10/06G06Q50/06
Inventor 江春华陈显龙罗新伟杨志鹏方文陈晓龙胡宝良牛仁义
Owner BEIJING FOREVER TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products