Novel prefabricated pipe impermeability test connector and impermeability test method using same
A new type of technology for pipe fittings, applied in the direction of using liquid/vacuum for liquid tightness measurement, pipes/pipe joints/pipe fittings, passing elements, etc. Problems such as the use of corridors and safety
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0026] New prefabricated pipe fittings anti-seepage test interface, refer to Figure 2 to Figure 3 As shown in , it includes prefabricated pipe fittings 1 and prefabricated pipe fittings 2 of corresponding shapes. One side end of prefabricated pipe fitting 1 and the side end of prefabricated pipe fitting 2 are flat end faces. Prefabricated pipe fitting 1 and prefabricated pipe fitting 2 There are two ring-shaped grooves 111, 112 and 211, 212, one large and one small, which are nested in each other. The grooves 111, 112 of the prefabricated pipe fitting 1 are respectively separated by an expansion strip 3 to seal the grooves 211, 211 and 212 of the prefabricated pipe fitting 2. 212. The prefabricated pipe 1 is provided with two through holes 12, 13, one end opening of the through holes 12, 13 is located in the area between the two annular grooves 111, 112, and the other end opening is located inside the prefabricated pipe 1, and the through holes 12 and 13 are respectively loc...
Embodiment 2
[0031] New prefabricated pipe fittings anti-seepage test interface, refer to Figure 4 to Figure 5 As shown in , it includes prefabricated pipe fitting 1a and prefabricated pipe fitting 2a of corresponding shape, one end of prefabricated pipe fitting 1a forms a circular socket 11a, and the end of one side of prefabricated pipe fitting 2a that is inserted into it forms a circular socket Mouth 21a.
[0032] The socket 21a includes the second working surface 212a of the socket and the first working surface 211a of the socket which are formed in a stepped shape on the inner wall of one end of the prefabricated pipe, and the first working surface 211a of the socket. Socket stepped surface 113a, socket second working surface 112a, and socket first working surface 111a that shrink outward sequentially, wherein a first glue-stop platform 114a is formed between socket first working surface 111a and socket second working surface 112a, and socket The second rubber-stopping platform 115a...