Unlock instant, AI-driven research and patent intelligence for your innovation.

Server power supply test system and method for performing power supply test on server

A technology of power supply testing and server, which is applied in the direction of detecting faulty computer hardware, etc. It can solve the problems of long server start-up time and extended test time, so as to speed up the power supply pressure test process, shorten the start-up time, reduce the detection time and personnel cost effect

Inactive Publication Date: 2011-10-12
INVENTEC CORP
View PDF3 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] However, since the tester has to wait for the completion of the POST program before proceeding to the subsequent power test, the server startup time is still too long, and if a large number of servers are tested, this test process will lengthen the overall test time

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Server power supply test system and method for performing power supply test on server
  • Server power supply test system and method for performing power supply test on server
  • Server power supply test system and method for performing power supply test on server

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0030] The following will clearly illustrate the spirit of the present invention with the accompanying drawings and detailed descriptions. After those skilled in the art understand the embodiments of the present invention, they can be changed and modified by the techniques taught in the present invention without departing from the present invention. spirit and scope.

[0031] The present invention discloses a server power testing system. The server power test system includes a server and a debug board. The debug board of the present invention instructs the server to skip a post-power-on self-check (POST) procedure when the server is turned on, so as to shorten the startup time of the server and accelerate the subsequent power stress test process.

[0032] Such as figure 1 as shown, figure 1 A block diagram of an embodiment of the server power testing system 100 of the present invention is shown.

[0033] The server 200 of the server power testing system 100 includes a moth...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a server power supply test system and a method for performing a power supply test on a server. The server power supply test system comprises a server and an error detection board, wherein the error detection board is electrically connected with the server; and when the server is started, an indication server skips over a powered-on self-checking program, so that the error detection board can directly perform a power supply pressure test flow on the server.

Description

technical field [0001] The present invention relates to a power testing system, in particular to a power testing system and method for servers. Background technique [0002] Traditionally, when a server is powered on for a power test, it is necessary to wait for the Basic Input / Output System (BIOS) to perform a Power-On Self Test (POST) procedure on the peripheral hardware one by one. In order to detect whether the peripheral hardware exists and whether these peripheral hardware can work normally, the power supply test of the next stage can be carried out, so as to test whether the various power supplies of the server can work normally. [0003] However, since the tester has to wait for the completion of the POST program before proceeding to the subsequent power test, the server startup time is still too long, and if a large number of servers are tested, this test process will lengthen the overall test time. [0004] In view of this, how to propose a solution that can effe...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06F11/22
Inventor 金志仁周盟森
Owner INVENTEC CORP