Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

560 results about "Start up time" patented technology

Game machine

To provide a game machine capable of enhancing interest in a game.SOLUTION: A game machine includes: clocking information update means capable of updating clocking information including information permitting identification of time even in a power interruption state; start time information storage means that is means capable of storing clocking information as start time information and can store stored start time information even during a power interruption state; and storage processing execution means for acquiring clocking information from the clocking information update means on the basis of starting of power supply to the game machine from the outside, and executing storage processing as processing for storing acquired clocking information in the start time information storage means as start time information. The storage processing execution means includes means for avoiding execution of storage processing when time included in clocking information in the clocking information update means does not pass predetermined time from time included in start time information stored in the start time information storage means.SELECTED DRAWING: Figure 80
Owner:SANYO BUSSAN KK

Monitoring system, method, device, equipment and medium of basic input and output system

The invention relates to the technical field of servers, and particularly discloses a monitoring system, method, device and equipment for a basic input and output system, and a medium. The starting state of the first basic input and output system is obtained after the first controller is powered on, and if it is recognized that the actual starting time exceeds the first starting time corresponding to the starting stage in the starting stage of the first basic input and output system, it is determined that starting of the first basic input and output system fails. And the first change-over switch is controlled to switch the first basic input / output system to the second basic input / output system, so that the first basic input / output system can be switched to the second basic input / output system in time when the first basic input / output system fails, the time for judging the starting timeout of the basic input / output system is shortened, and the starting speed of the server is improved.
Owner:INSPUR SUZHOU INTELLIGENT TECH CO LTD

Automatic testing system and method capable of being arranged and executed in batches

The invention provides an automatic test system and method capable of being arranged and executed in batches, and the system comprises a test case arrangement plan table which is used for customizing the starting time, the precondition and the dependency relationship of each test item, whether execution is terminated or not when the test item fails, grouping execution, result archiving, product dependency and user-defined labels; the default configuration management module is used for parameterizing execution and supporting simple configuration to realize visual operation of the test script; the software framework supports an object-oriented language and provides multi-process processing to improve execution efficiency; and the distributed structure is used for realizing concurrent parallel execution across a plurality of processors or machines and supporting synchronous import and concurrent asynchronous execution of a plurality of test items. Through the support of multi-process processing and a distributed structure, the advantages of a multi-core processor and computing resources of cross-network nodes can be fully utilized, multiple test items are executed in parallel, the execution efficiency of automatic testing is greatly improved, and the overall testing period is shortened.
Owner:GANGSHENG TECH SERVICES (SHENZHEN) LTD

Industrial control system security auditing method and system

The invention relates to the technical field of security auditing, in particular to a security auditing method and system for an industrial control system, and the method comprises the following steps: aiming at a key control task, a communication task and a security task of a real-time operating system, collecting a period, a starting timestamp, a finishing timestamp, a central processing unit occupied time slice and peak memory usage amount data. According to the method, the period, timestamp, central processing unit occupation and memory usage data of a key task of a real-time operating system are collected, a task execution time boundary and a resource consumption envelope are set, and then an expected relation rule set of a task time sequence and resource consumption is constructed by applying historical data statistics and logic rule deduction; and meanwhile, the key length of symmetric and asymmetric encryption, initialization vector generation, hash algorithm selection, key derivation parameters and encryption operation context are stipulated, so that a comprehensive and specific ICS behavior specification baseline is established.
Owner:CHONGQING HUATAI ACCOUNTING FIRM (GENERAL PARTNERSHIP)

Function cold start optimization method and device, equipment and medium

The invention discloses a function cold start optimization method and device, equipment and a medium, and relates to the technical field of server-free computing, when a function computing request for a target process-level function is received, a target snapshot matched with target function information of the function computing request is determined from a preset storage space; starting a snapshot recovery process of the target snapshot to read snapshot data of the target snapshot; and asynchronously loading the snapshot data in the target function instance so as to recover the execution environment of the target function instance and realize cold start of the function. After the process-level snapshot of the function instance is created after the function instance is executed for the first time, the snapshot is quickly recovered in the subsequent new function calculation request, so that the cold start time is shortened, and the response speed and availability of the function service are improved. Through the process-level snapshot technology, the function execution environment is quickly recovered, the function cold start time is greatly shortened, and the snapshot recovery process is much faster than the function instance re-initialization process, so that the response speed of the service is improved.
Owner:SHANDONG LANGCHAO YUNTOU INFORMATION TECH CO LTD

Game machine

To provide a game machine capable of enhancing interest in a game.SOLUTION: A game machine includes: clocking information update means capable of updating clocking information including information permitting identification of time even in a power interruption state; start time information storage means that is means capable of storing clocking information as start time information and can store stored start time information even during a power interruption state; and storage processing execution means for acquiring clocking information from the clocking information update means on the basis of starting of power supply to the game machine from the outside, and executing storage processing as processing for storing acquired clocking information in the start time information storage means as start time information. The storage processing execution means includes means for avoiding execution of storage processing when time included in clocking information in the clocking information update means does not pass predetermined time from time included in start time information stored in the start time information storage means.SELECTED DRAWING: Figure 80
Owner:SANYO BUSSAN KK

Resource scheduling method and device, electronic equipment and storage medium

The embodiment of the invention provides a resource scheduling method and device, electronic equipment and a storage medium, and the method comprises the steps: obtaining task meta-information and task constraint information of each task in a task set, and determining to-be-executed tasks in each time period based on the task meta-information and the task constraint information, determining the total resource consumption amount of each time period based on the resource consumption amount of the to-be-executed tasks, determining a target time period in which the total resource consumption amount is greater than the set total available resource amount from each time period, and obtaining adjustable tasks from the to-be-executed tasks in the target time period, and determining the scheduling priority of each adjustable task based on the resource consumption of the adjustable tasks, the downstream task quantity and the task running duration, determining the adjustable task with the lowest scheduling priority as a target task, and adjusting the predicted starting time of the target task according to a preset adjustment strategy.
Owner:CHONGQING ANT CONSUMER FINANCE CO LTD

Instrument program starting method and device, equipment and storage medium

The embodiment of the invention discloses an instrument program starting method and device, equipment and a storage medium, and the method comprises the steps: verifying the integrity of a first bootstrap program and a second bootstrap program based on a main bootstrap program after an instrument verification instruction is received, and determining a target secondary bootstrap program based on an integrity verification result; checking the current state and the current mode of the target secondary bootstrap program to obtain a state checking result and a mode checking result; and under the condition that the state verification result is a normal state and the mode verification result is a non-upgrading mode, starting a main program corresponding to the target secondary bootstrap program to complete the instrument program starting step. According to the technical scheme, the problem that in the prior art, the starting time of the vehicle instrument system is too long is solved, only part of key programs can be verified during starting, the requirement for safe operation of the system is met, meanwhile, the starting time of the vehicle instrument system is shortened, and the user experience feeling is improved.
Owner:CHINA FAW CO LTD

Production scheduling method and system for fast board orders, electronic equipment and medium

The invention discloses a production scheduling method and system of fast board orders, electronic equipment and a medium, and relates to the technical field of data processing. The method comprises the following steps: acquiring processing parameters and a processing sequence of a plurality of processes in a fast board order and production data of processing equipment corresponding to each process; based on the processing sequence and the completed number corresponding to each process, calculating the difference value of the completed number between the plurality of adjacent processes; according to the difference value of the number of finished products, the number of products in process between the processes is determined, and the buffer waiting time between the processes is set based on the number of the products in process; and calculating the machining duration deviation ratio between the workpiece machining time of each process and the corresponding planned machining time, and when the to-be-adjusted process with the machining duration deviation ratio exceeding a deviation ratio threshold exists, delaying the machining starting time of the subsequent process based on the buffer waiting time of the to-be-adjusted process. By implementing the technical scheme provided by the invention, the overall production efficiency of the fast order can be improved.
Owner:SHENZHEN HARD SISTER TECHNOLOGY CO LTD

UE initatied early timing advance acquisition

Methods and apparatuses for user equipment (UE) initiated early timing advance acquisition A UE includes a transceiver configured to receive an early timing advance (TA) configuration including an early TA random access (RA) resource for a candidate cell for conditional layer 1 / layer 2 triggered mobility (CLTM), transmit, on the early TA RA resource, a physical random access channel (PRACH) preamble to the candidate cell, and receive a message including a current TA for the candidate cell. The UE further includes a processor operatively coupled to the transceiver. The processor is configured to apply the current TA to the candidate cell, and start a time alignment timer (TAT) for the candidate cell.
Owner:SAMSUNG ELECTRONICS CO LTD

Starting Time Alignment Timer Before Receiving an Initial Timing Advance Command

A base station transmits a radio resource control (RRC) message indicating that a wireless device starts a time alignment timer of a timing advance group (TAG) in response to the RRC message. The base station starts the time alignment timer of the TAG before transmitting an initial medium access control (MAC) timing advance command (TAC) for the TAG and after transmitting the RRC message.
Owner:PENINSULA TECH LLC

Secure communications using pre-shared keys and live membership

The described techniques address issues to achieve key agreement without the need to exchange separate key agreement messages and, consequently, meets the stringent starting time requirements for real-time control systems. This is achieved using a group-wide key counter, with each node storing the latest value of this counter that was observed via the last received secured message. This counter value increases monotonically, and nodes maintain synchronization by transmitting this counter value (or a representation of the counter value) in each secured message. The use of key counters may be extended to guard against weak replay attacks via the implementation of a live membership tracking solution, which defines one or more membership groups. Each node within a membership group may request, or “challenge” other nodes with the same membership group at any time to verify their online status, and this online status may be maintained over time.
Owner:INFINEON TECHNOLOGIES AG

Method and apparatus for accessing secondary channel in wireless LAN system

PCT designated stage expiredWO2025005562A1Network topologiesStart timeTelecommunications
Disclosed are a method and an apparatus for operating in a wireless LAN system. A method performed by a first station (STA) in a wireless LAN system according to one embodiment of the present disclosure may comprise the steps of: receiving, from an access point (AP), a first frame including information related to a plurality of non-primary channels and information related to a timer for non-primary channel access; and on the basis that transmission or reception of a second frame on a first non-primary channel among the plurality of non-primary channels fails before the timer expires, performing a back-off procedure on a second non-primary channel among the plurality of non-primary channels, wherein a start time point of the timer may be the same as a start time point of a back-off counter related to the back-off procedure on the first non-primary channel.
Owner:LG ELECTRONICS INC

Method for allocating equipment resources and server

The invention provides a method and a server for allocating device resources, and the method comprises the steps: reading each PCIe device space register through a baseboard management controller (BMC), obtaining a bus BUS resource and a Memory or IO space address resource required by each PCIe device through reading each PCIe device space register, and according to the acquired bus BUS resource and Memory or IO space address resource required by each PCIe device, allocating the corresponding bus BUS resource and Memory or IO space address resource to each PCIe device. By means of the method, the time cost consumed when the BIOS traverses the PCIe external device and configures various types of resources can be saved, and the starting time of the whole machine is optimized.
Owner:NEW H3C TECH CO LTD

Process task starting control method and semiconductor cleaning equipment

The invention discloses a process task starting control method and semiconductor cleaning equipment. The method comprises the steps that a started process task list and a to-be-started process task list are obtained, the started process task list comprises started process tasks which are started and still executed in a process area, and the to-be-started process task list comprises at least one to-be-started process task to be started; determining a to-be-started process task, which has no conflict with each started process task, in the to-be-started process task list as a target to-be-started process task according to the occupied time intervals of a manipulator and each process module in the process area; determining target starting time of the target to-be-started process task; and starting the target to-be-started process task according to the target starting time. According to the invention, some process chambers of the semiconductor cleaning equipment are prevented from being idle for a long time, so that the overall utilization rate of the semiconductor cleaning equipment is improved, and the productivity is improved.
Owner:BEIJING NAURA MICROELECTRONICS EQUIP CO LTD

Control method and device for heat dissipation equipment on server and electronic equipment

The embodiment of the invention provides a control method and device for heat dissipation equipment on a server and electronic equipment, the server comprises a server component, a first controller and the heat dissipation equipment, a first operating system and a second operating system are deployed on the first controller, and the method comprises the steps that the first controller starts to be started when the server is powered on; the first operation system starts to control the heat dissipation equipment to operate from the first time after the starting time of the first controller; the first operation system stops controlling the heat dissipation equipment to operate at a second time after the first time; and the second operation system starts to control the operation of the heat dissipation equipment from the second time. According to the method and the device, the problem that the timeliness of heat dissipation of the server in the powered-on state by the heat dissipation equipment is poor is solved, and the effect of the timeliness of heat dissipation of the server in the powered-on state by the heat dissipation equipment is further achieved.
Owner:INSPUR SUZHOU INTELLIGENT TECH CO LTD

Segmented starting method and device of system, storage medium and electronic equipment

The invention relates to a segmented starting method and device of a system, a storage medium and electronic equipment. The method comprises the steps that when a system starts to be powered on, a system starting part of firmware is loaded according to head information of the firmware so as to start the system, and the firmware comprises the head information, the system starting part and a system application part; after the system is started and when it is determined that the system meets the loading condition of any system application part, the system application part of the firmware is loaded according to the head information so as to start the system application of the system. The technical problem that the starting time of the embedded system is too long is solved.
Owner:ROLLING WIRELESS SARL

Method for seamlessly changing a value of an extended unique identifier of a non-AP station associated with an AP station

According to some embodiments of the disclosure, it is provided a method for changing a value of an Extended Unique Identifier, EUI, of a non-access point, non-AP, station associated with an access point, AP, station, the non-AP station and the AP station both using a same mechanism for determining a new value of the EUI. After obtaining an EUI change start time and a transition period duration and after determining the new value of the EUI, data are transmitted to or received from the non-AP station or the AP station, using the EUI value to be changed and the new EUI value, from the obtained EUI change start time and for at most the obtained transition period duration. An item of information for obtaining the EUI change start time is received from or is transmitted to the non-AP station or the AP station.
Owner:CANON KK

Main steam temperature control method for guaranteeing safe operation of steam turbine rotor

The invention discloses a main steam temperature control method for guaranteeing safe operation of a steam turbine rotor, which relates to the technical field of steam turbines, and comprises the following steps: defining a system state, a temperature control action and a reward function, taking a neural network as an intelligent agent, and interacting with a quick starting process of a steam turbine; in the interaction process, the intelligent agent receives the system state of the steam turbine and outputs a temperature control action; the steam turbine performs temperature adjustment according to the temperature control action and feeds back rewards to the intelligent agent based on a reward function; the intelligent agent evaluates whether the temperature control action is good or bad through rewards until the accumulated rewards converge; and after the accumulated rewards converge, the intelligent agent outputs an optimal temperature control action, and the temperature of main steam in the quick starting process of the steam turbine is controlled through the optimal temperature control action. The main steam temperature can be dynamically adjusted, and the starting time can be remarkably shortened on the premise that the safety of the rotor is guaranteed.
Owner:XI AN JIAOTONG UNIV

Remote terminal unit (RTU)-based intermittent pumping start-stop control method and system of pumping unit

The invention discloses an RTU (remote terminal unit)-based intermittent pumping start-stop control method and system for an oil pumping unit, which not only considers the actual influence of historical well opening data of an oil well in a preset historical well opening period on oil production, but also can effectively and reliably determine the oil well intermittent pumping duration corresponding to the oil pumping unit. And traversing and screening time points in each group of start-stop time periods in a manner of dividing at least one group of start-stop time periods in the intermittent pumping time length of the oil well, so as to obtain the required start-stop time periods and the intermittent pumping start time under the corresponding condition. And the influence of the pump fullness degree of the oil pumping unit in the start-stop time period on intermittent pumping control is also considered, so that the target operation cycle of the oil pumping unit is obtained according to the pump fullness degree and the corresponding parameter threshold value, and finally the oil pumping unit is controlled to perform oil well intermittent pumping operation according to the target operation cycle. The intermittent pumping control precision and adaptability of the pumping unit can be remarkably improved, safe and reliable intermittent pumping automatic operation is achieved, and the intermittent pumping management difficulty of well site personnel can be reduced.
Owner:西安众望能源科技有限公司

Compatibility testing method for solid state disk

The invention relates to the technical field of data storage, and discloses a solid state disk compatibility testing method which comprises the following steps: after a solid state disk is started, automatically collecting basic performance information of the solid state disk based on a Python script and generating a standardized log file; running performance operation of the solid state disk in a preset time period, and simultaneously executing multi-user or multi-task concurrent test operation based on the automated script; a script is used for calling a system startup command or a shutdown command, the next startup process is automatically triggered after shutdown, a startup and shutdown cycle test mechanism is formed, and the startup time, the initialization duration and the abnormal interruption record of the solid state disk are synchronously collected in each startup and shutdown process; when the system runs, the Python script is used for safely removing and reinserting the solid state disk. The problem that an existing test method is narrow in platform coverage range is solved.
Owner:SHENZHEN JINGCUN TECH CO LTD

User Equipment Reuse of Timing Advance Obtained during Data Reception for Subsequent Data Transmission

Embodiments include methods for a user equipment (UE) configured to operate in a cell served by a radio access network (RAN) node. Such methods include receiving at least the following information from the RAN node during a first procedure: downlink (DL) data associated with an application hosted by the UE, and a timing advance (TA) command applicable to UE uplink (UL) transmissions to the RAN node. Such methods include initiating a time alignment timer (TAT) in response to receiving the TA command. Such methods include, after completion of the first procedure and based on determining that the TAT has not expired, transmitting to the RAN node one or more messages according to a timing adjusted based on the TA command. Other embodiments include complementary methods for a RAN node, as well as UEs and RAN nodes configured to perform such methods.
Owner:TELEFONAKTIEBOLAGET LM ERICSSON (PUBL)

Event message processing method and device, electronic equipment and storage medium

The invention provides an event message processing method and device, electronic equipment and a storage medium. The method comprises the steps that an event message is acquired, and the event message is generated when a user performs corresponding operation on a platform to trigger a target event; determining an event processing strategy and a delay parameter corresponding to the target event according to the event message; constructing a delay task according to the event processing strategy and the delay parameter; the delay task is added to a corresponding slot position of a time round algorithm, so that execution of the delay task is triggered when the current time reaches a time point corresponding to the slot position, and the time point corresponding to the slot position is a starting time point corresponding to the delay task. According to the method, the delay task with second-level precision is triggered through the time wheel algorithm, so that accurate execution of the delay task can be ensured, and the processing efficiency is improved.
Owner:BEIJING QIYI CENTURY SCI & TECH CO LTD

Safe starting time optimization method and device, terminal and storage medium

The invention discloses a safe starting time optimization method and device, a terminal and a storage medium, and the method comprises the steps that when a program execution signal is received, system firmware of a vehicle-mounted system is subjected to block processing, and a block processing result comprises a default check block and a random sampling check block; obtaining measured check-free starting time and total check time, and calculating the configuration number of the random spot check blocks according to a preset safety starting time upper limit; extracting the random extraction blocks corresponding to the configuration number in combination with a preset dynamic probability algorithm, and summarizing to obtain a to-be-detected block set; and performing hierarchical verification on the to-be-detected block set to obtain a verification result, and when the verification result is failure, performing atomic rollback according to the classification of the to-be-detected blocks. According to the method, on the premise that the firmware safety is guaranteed, the safety starting time can be effectively shortened, and the efficiency is improved.
Owner:GRC AUTOMOTIVE TECH (SUZHOU) CO LTD

Game machine

To provide a game machine capable of enhancing interest in a game.SOLUTION: A game machine includes: clocking information update means capable of updating clocking information including information permitting identification of time even in a power interruption state; start time information storage means that is capable of storing clocking information as start time information and can store stored start time information even during a power interruption state; storage processing execution means for acquiring clocking information from the clocking information update means on the basis of starting of power supply from the game machine to the outside, and executing storage processing as processing for storing acquired clocking information in the start time information storage means as start time information; and start processing execution means for executing either start processing from among a plurality of kinds of start processing on the basis of starting of power supply from the outside to the game machine. The storage processing execution means includes means for avoiding execution of storage processing when a type of start processing executed by the start processing execution means is specific start processing from among a plurality of pieces of start processing.SELECTED DRAWING: Figure 75
Owner:SANYO BUSSAN KK

Loop heat pipe and electronic equipment

The invention provides a loop heat pipe and electronic equipment, relates to the technical field of electronic equipment, and aims at solving the problems that an existing loop heat pipe is long in starting time and low in response speed. The loop heat pipe comprises a shell and a first wick. Wherein an evaporation cavity, a plurality of condensation cavities and a plurality of circulation channels are formed in the shell, the first wick is arranged in the evaporation cavity, each circulation channel is provided with one condensation cavity, and each condensation cavity communicates with the evaporation cavity through the corresponding circulation channel, so that each circulation channel can conduct evaporation condensation circulation. According to the loop heat pipe, on the premise that the size is not changed, the path length of each evaporation and condensation circulation is shortened (equivalently, the length of each circulation channel is shortened), steam can rapidly reach the condensation cavity to be condensed, a liquid working medium obtained through condensation can rapidly flow back into the evaporation cavity, and the evaporation efficiency is improved. Therefore, the starting response speed of the loop heat pipe is accelerated.
Owner:HONOR DEVICE CO LTD

Request inference task processing method, device, equipment, medium, product and heterogeneous system

The invention discloses a reasoning request task processing method, device and equipment, a medium, a product and a heterogeneous system, and relates to the technical field of artificial intelligence. The method comprises the following steps: acquiring reasoning task information corresponding to each reasoning request task and computing power resource information of a heterogeneous computing system; according to the reasoning task information and the computing power resource information, determining target computing equipment for executing a pre-filling stage and a decoding stage of each reasoning request task and corresponding task starting time on the basis of a condition that the processing cost of each reasoning request task is lowest under the condition that each task processing requirement information is met; and sending the task allocation result as a task allocation request to the heterogeneous computing system, and executing a corresponding task by each target computing device according to the task starting time of the task allocation request. The problem that task processing requests and low execution cost are difficult to consider at the same time in the prior art can be solved, and the computing devices are allocated to the reasoning tasks as low as possible under the condition that the task processing requirements are met.
Owner:SHANDONG HAILIANG INFORMATION TECH RES INST

Avoidance of drop in rotational speed during roll entry

In a roll stand (1), a rolling material (2) made of metal and having a rolling material leading edge (6) is to be rolled. A time of entry (t3), a rolling speed (vW) and a rolling moment (MW) are known to a control device (7) for the roll stand (1) before the rolling material leading edge (6) runs into the roll stand (1). Before a starting time (t2), which is before the entry time (t3), the control device (7) determines, for a period from the starting time (t2) to the entry time (t3), a moment profile (M) for a roller (3) of the roll stand (1) via a drive (4) driving a drivetrain (5). It controls the drive (4) during the period in accordance with the determined moment profile (M). The control device (7) determines the moment profile (M) starting from a starting state (x2), at the starting time (t2), of the drive (4), of the drivetrain (5) and of the driven rollers (3) of the roll stand (1) such that the driven rollers (3) of the roll stand (1) are acted on by the drivetrain (5) with the rolling moment (MW) at the entry time (t3) and rotate with a circumferential speed (vU) adapted to the rolling speed (vW).
Owner:PRIMETALS TECH GERMANY GMBH

Large steam turbine valve leakproofness test method

The invention discloses a large steam turbine valve leakproofness test method, and relates to steam turbine valve leakproofness tests. In order to solve the technical problem that in the prior art, a steam turbine valve leakproofness test method capable of reducing the starting time of a unit, saving the starting cost and improving the safety of the unit in the starting stage is urgently needed, the technical scheme provided by the invention is as follows: a large steam turbine valve leakproofness test method is provided. Comprising the steps that boiler steam pressure of a turbine corresponding to a target valve is adjusted to a preset interval; detecting the rotating speed of the steam turbine unit in the state that all the main valves are opened and the speed regulating valve is closed; when the rotating speed is smaller than a preset threshold value, a main throttle valve leakproofness test is conducted; the main valve leakproofness test specifically comprises the following steps: opening a speed regulation valve at a preset constant speed, gradually increasing to a full-open position, judging the current rotating speed of the steam turbine unit, and outputting a leakproofness qualified result if the current rotating speed is smaller than a preset threshold value. The device is suitable for the leakproofness test of the large steam turbine valve.
Owner:DATANG DONGBEI ELECTRIC POWER TESTING & RES INST