Method of physical resource management in a wideband communication system
A management method and technology of physical resources, applied in the field of managing physical resources in such a broadband communication system, can solve problems such as low-capacity user equipment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0030] figure 2 An exemplary OFDMA broadband communication system 42 comprising a base station (BTS) 44 and exemplary UEs 46, 47 and 48 is shown. The base station 44 includes a packet scheduler 50, transport channel processing blocks (indicated by reference numerals 52 and 54, respectively) for the SCCH and SDCH of each scheduled UE, transport and other channels, physical channel mapping block 56, inverse fast Fourier Transform (IFFT) processor 58 , cyclic prefix (CP) insertion block 60 , radio frequency block (FR) 61 and antenna 62 .
[0031] Each UE 46, 47 and 48 includes antenna 64, RF processing block 66, cyclic prefix removal block 68, fast Fourier transform (FFT) processor 70, physical channel de-mapping (de-map) block 72 for SCCH and SDCH The transmission processing blocks 74 and 76 and the CQI (Channel Quality Indication) measurement block 78 of .
[0032] The scheduling block 50 controls the overall resource allocation and data transmission to all UEs 46 , 47 and 4...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 