Upper-blocking and lower-draining construction method for undersea tunnel fault fracture zone

A subsea tunnel and construction method technology, which is applied to tunnels, tunnel linings, underground chambers, etc., can solve the problem of not being able to meet the requirements of reinforcement strength and limited drainage of tunnels, not only being able to ensure the safety of construction excavation, and dealing with fault fracture zone for a long period, etc. problems, achieve the effect of reducing blindness, reducing the number of drilling and grouting, and high construction efficiency

Active Publication Date: 2012-11-21
CHINA RAILWAY TUNNEL GROUP CO LTD
View PDF1 Cites 20 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The freezing method is a method that uses refrigerant to transfer cold energy to cool the water-bearing strata to freeze, and relies on the strength of the frozen rock and soil to bear the pressure of the surrounding rock, so that the excavation and support can be carried out safely under the protection of the frozen rock and soil. The method is expensive and has a long operating cycle, and is usually applied to formations that cannot be used by other methods
[0006] Some of the above methods have a long

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Upper-blocking and lower-draining construction method for undersea tunnel fault fracture zone
  • Upper-blocking and lower-draining construction method for undersea tunnel fault fracture zone
  • Upper-blocking and lower-draining construction method for undersea tunnel fault fracture zone

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0033] The present invention will be further explained below in conjunction with the accompanying drawings. It should be noted that the purpose of disclosing the present invention is to protect the construction method within the concept of the present invention and the relevant technical standards and parameters proposed. The excavation and drainage of the lower half section and the development of rock-soil zones through fault fracture zones or fissures are all within the protection scope of the present invention.

[0034] In order to make the above objects, features, advantages and related technical parameters of the present invention more obvious and understandable, the embodiments of the present invention will be further described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0035] like figure 1 As shown, a construction method for subsea tunnel fault fracture zone with upper blockage and lower row, adopts two major co...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to the technical field of underground engineering construction, and discloses an upper-blocking and lower-draining construction method for an undersea tunnel fault fracture zone. The method comprises the following steps of: rapidly grouting the upper half section of a tunnel for reinforcing, forming inspection holes according to 3-5 percent of number of grouting holes, drilling drainage inspection holes on the lower half section of the tunnel, and excavating and supporting on the upper half section of the tunnel when the maximum water inflow of a single inspection hole is lower than a predetermined standard; and rapidly excavating on the lower half section of the tunnel, and enclosing the initial support of the tunnel into a ring in time to safely and smoothly pass through the fault fracture zone and ensure that the tunnel is free from leakage basically. The construction method is suitable for an undersea tunnel fault fracture zone or a broken rock stratum developed from a water-rich crack; and construction is performed in an enclosed structure, so that the safety of tunnel excavation construction is ensured, the work amount of drilling, grouting, reinforcing and blocking water is reduced, and the requirement of drainage prevention is met. The construction method has the advantages of high construction efficiency, low cost and contributes to saving investment and time for successful building of the tunnel.

Description

technical field [0001] The present invention relates to the technical field of underground engineering construction, in particular to a kind of subsea tunnel fault fracture zone upper and lower plugging when the subsea tunnel passes through the water-rich fault fracture zone and the cracked rock mass when the upper half section is grouted for water blocking and the lower half section is excavated for drainage Row construction method. Background technique [0002] Due to the continuous growth of the economic strength of my country's coastal cities, the rapid development of urban construction, and the continuous expansion of urban scale, there will be many submarine tunnels or underwater tunnels in coastal areas. Building tunnels on the seabed will face more serious groundwater prevention and control problems than those on land. Subsea tunnels are generally large in scale and have a tight construction period. Once mud and water inrush occur, the consequences will be unimaginab...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E21D9/00E21D11/10
Inventor 卓越王明胜罗嵩杨祖根
Owner CHINA RAILWAY TUNNEL GROUP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products