A connection device for a composite material node and an assembly method thereof
A technology of composite materials and connecting devices, which is applied in the direction of architecture and building construction, can solve the problems of restricting applications and increasing structural complexity, and achieve the effects of improving the level of lightning protection, avoiding one-time dead connections, and novel structures
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
example 1
[0085] like Figure 11 As shown, the assembly process is schematically shown. First, put the locking element assembly 104 into the single-ear hoop structure 103 according to the axial direction P1 of the hoop main sleeve, and then insert the composite material auxiliary rod 102 along the axial direction P2 of the hoop auxiliary rod sleeve, Until it reaches the position of the positioning platform, loosen the tension bolt 1043 of the locking piece assembly 104, increase the distance between the middle seams of the locking block assembly by 5 mm to 8 mm, and approach the arc surface of the composite material main rod 101, along the Insert the composite material main rod 101 to the positioning platform in the P3 direction, and pull the locking blocks 1041 and 1042 by tightening the nuts 1044 to expand and compress the composite material main rod 101 and the composite material auxiliary rod 102 to realize the integral connection.
example 2
[0087] like Figure 18 As shown, the all-composite material node connection device is a double-ear hoop structure, which includes a connected composite material main rod 101 and a composite material auxiliary rod 102. The locking block 104 realizes the fixed connection. The outer surface of the joint is regular and there are no exposed joints; especially no exposed metal joints.
[0088] Firstly, put the 2 pieces of locking piece assembly 104 into the double-eared hoop structure 106 according to the P1 and P2 directions of the main sleeve D1 of the double-eared hoop, and then put the composite material main rod 101 along the double-eared hoop Insert it into the P3 direction of the main sleeve until it reaches the position of the positioning platform, loosen the tension bolt 1043 of the locking piece assembly 104, and increase the distance between the two locking block assemblies 1041 and 1042 by 5mm to 8mm. Close to the mating surface M1-1 of the composite material main rod ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com