An installation process and jacket technology, which is applied in the field of offshore oil engineering, can solve the problems of delaying new product development, affecting the development of offshore engineering, and wasting test time, so as to reduce offshore installation costs and test costs, and overcome high offshore installation costs , the effect of improving accuracy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0027] Such as figure 1 As shown, firstly, the jacket 2 for the test is built on land, and the jacket 2 for the test is transported to the pier 9 for installation. The specific installation steps are as follows:
[0028] The first step: if figure 2 As shown, the support frame 1 is arranged on the pier 9;
[0029] The second step: if image 3 As shown, several anti-collision parts 3 are installed on the lower side of the test jacket 2 by means of bolt connection;
[0030] Step 3: If Figure 4 As shown, one end of the cable 4 is permanently fixed to the upper end of the test jacket 2 by bundling or shackle connection, and the other end of the cable 4 is also temporarily fixed to the test jacket by bundling or shackle connection. 2 is attached to the structure 5;
[0031] Step 4: If Figure 5 As shown, the jacket 2 for the test is hoisted and positioned at the set position by the sling 8 hung on the crane;
[0032] Step 5: If Figure 6 As shown, a counterweight 6 is plac...