A cable-stayed cable main and cable guide technology, which is applied in the direction of cable-stayed bridges, bridge forms, bridge parts, etc., can solve the problems of shortening the service life of the formwork and the obstruction of formwork jacking, so as to speed up the construction progress and reduce the jacking Difficulty, effect of saving stakeout time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0010] The present invention consists of a tower inner cable guide 1 pre-buried in the tower wall and a tower outer cable guide 5 installed after the main tower formwork is lifted.
[0011] The pressure-bearing steel plate 2 on the top of the cable guide in the tower is flush with the tooth block 3 inside the tower wall. Outside the main tower, the pre-buried inner cable conduit 1 is flush with the outer side of the tower wall. In order to meet the requirements of bending performance, the outer cable conduit 5 of the tower is provided with stiffening ribs 9 at the connection part.
[0012] refer to figure 1 , 2 , when bolts are used between the tower inner cable guide and the tower outer cable guide, the end of the tower inner cable guide 1 is provided with a connecting plate 4, and the end of the tower outer cable guide 5 is provided with a connecting plate 6, and the connection between the connecting plate 4 and the connecting plate 6 Use high-strength bolts 7 to connect ...