A construction method for setting and processing inner partitions of formed rectangular steel members
A construction method and technology of rectangular steel, which can be applied to building structures, buildings, etc., can solve problems such as inability to add inner partitions, and achieve the effects of shortening construction period, low engineering cost, and small deviation of geometric dimensions.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0037] A construction method for setting and processing internal partitions of formed rectangular steel members. The formed rectangular steel column member 1 includes a formed steel column member or a formed steel beam member, and an internal partition 2 is set inside the formed rectangular steel member 1. status, such as figure 1 As shown, the construction process of the construction method for setting the inner partition 2 includes 1) measuring the marking line, 2) marking the positioning line for cutting the cover plate, 3) cutting the cover plate, 4) the inner partition plate parts and the formed rectangular steel member 1 5) The cut-off cover plate is put back and welded and fixed at the original position of the cut hole of the formed rectangular steel member 1. The operation steps of each process are as follows:
[0038] 1) Measure the scribe line
[0039] The inner partition 2 is set in the formed rectangular steel member 1, and the steel tape measure and stone pen are...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 