Hierarchical modular power network planning scheme optimization method

A technology of power grid planning and optimization method, which is applied in the direction of instruments, data processing applications, forecasting, etc., and can solve problems such as easy omission of asset substation loads, unclear principles of variable load calculation, and annual maximum load matching.

Active Publication Date: 2014-05-14
STATE GRID CORP OF CHINA +1
View PDF3 Cites 9 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] 2) Lack of description of sub-voltage levels
[0007] 3) The principle of power output calculation is not clear
However, in actual work, due to the confusion of concepts and unclear principles, planning engineers of prefectural and city companies often include the output of 110kV ground-regulated power supply in the annual maximum load value when compiling the planning report, which is not deducted when calculating the capacity-to-load ratio. Calculation result

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Hierarchical modular power network planning scheme optimization method
  • Hierarchical modular power network planning scheme optimization method
  • Hierarchical modular power network planning scheme optimization method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0074] The specific implementation of the present invention is based on the actual grid structure of a certain city in a certain year, and calculates the maximum load, simultaneous rate, capacity-load ratio and other indicators of the regional grid in the current year, and calculates the imbalance degree indicators to formulate the preliminary planning scheme. After the basic planning plan is formulated, combined with the project collection classified by the capacity-load ratio sensitivity coefficient, the nature of its impact on the unqualified regional capacity-load ratio is verified one by one, and individual projects are eliminated or delayed to ensure regional capacity. The ratio is in the qualified range, and finally the optimization of the planning scheme is realized.

[0075] The basic situation of the grid to be analyzed is as follows

[0076] Table 1 Brief introduction of power grid organization in a certain city

[0077] (a)

[0078]

Number of ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a hierarchical modular power network planning scheme optimization method. The method includes the steps that (1) a county-level planning unit serves as a minimum unit of a calculation system of the method, and the calculation problem of the capacity-load ratio of an interconnected area is solved by means of division coefficients; (2) a calculation system is built on the basis of the method, and imbalance degrees, such as the largest load imbalance degree, the coincidence factor imbalance degree and the capacity-load ratio imbalance degree, of indexes in a target area are obtained quantitatively; (3) sensitivity of the capacity-load ratio to an item is analyzed, the concept of a sensitivity coefficient is put forward and accordingly influences of operation of the item on the capacity-load ratio of the area are weighed; (4) a load prediction method in a new planning period is put forward, according to the method, a hierarchical modular analysis concept is adopted, firstly, the whole load prediction work is divided into different levels of load prediction according to a certain rule, the natural growth rate of the load of each level is solved level by level, and ultimately the largest load of each level of a power grid at the end of the planning period is solved from bottom to top.

Description

technical field [0001] The invention relates to a method for calculating indexes of hierarchical modularized power grid planning, and belongs to the technical field of electrical engineering planning. Background technique [0002] Power grid planning indicators are the basis of planning scheme formulation, and also the most fundamental problem facing planning work. With the long-term shortage of power grid construction funds, the requirements for internal and external management of power grid development are increasing day by day, especially with the deepening of large-scale planning system, discussion and practice, it is required that power grid planning must be lean for power grid projects in the next two years Planning, the informatization of power grid planning business has also been put on the agenda. In order to realize the informatization of planning business, it is necessary to ensure the accuracy and standardization of basic data. Therefore, it is very necessary t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/04G06Q50/06
CPCY04S10/50
Inventor 章力程虹周天晖王伟杨超钟士元罗路平熊宁
Owner STATE GRID CORP OF CHINA
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products