A factory-like technology for oil and gas wells, applied in earthwork drilling, wellbore/well components, production fluids, etc. It can solve the problems of long downtime of key equipment, large amount of proppant preparation, and long construction time, etc., and achieve shortening Construction reconstruction time and completion period, improvement of construction efficiency and construction benefits, and the effect of improving construction technology content
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0048] An oil well horizontal well factory fracturing method, such as image 3 As shown, hydraulic jet staged fracturing or PSK multi-stage hydraulic jet fracturing technology is used for construction. The wellsite layout adopts the factory-based wellsite layout, which is arranged in five functional areas: liquid storage, sand storage, mixing, fracturing, and recovery.
[0049] In the construction preparation stage, an independent operation team will use the 250 workover rig to complete all the well-cleaning and three-sample procedures at one time before the oil testing unit is in place. The three-sample measurement includes measuring "sonic amplitude" and "gamma". "Radioactivity" and "magnetic positioning". After the design plan is in place, relocate the oil test unit for construction.
[0050] For the distribution of construction materials, the well site is used to set up material storage points, and materials such as guar gum powder, liquid additives, ceramsite, quartz sand, et...
Embodiment 2
[0063] A method for factory fracturing of horizontal wells in gas wells, such as Figure 4 As shown, hydraulic jet staged fracturing or open-hole packer staged fracturing technology is used for construction. The wellsite layout adopts the factory-based wellsite layout, which is arranged in five functional areas: liquid storage, sand storage, mixing, fracturing, and recovery.
[0064] In the construction preparation phase, an independent operation team will use the 350 workover rig to complete the flushing and pressure testing of all gas wells at one time before the oil testing unit is in place.
[0065] For the distribution of construction materials, the well site is used to set up material storage points, and materials such as guar gum powder, liquid additives, ceramsite, quartz sand, etc. realize the mode of factory distribution and direct supply of large packaging, reducing the intermediate links of inversion and saving logistics Guarantee time.
[0066] The supply of produced w...