A technology for water level measurement and water level monitoring, applied in the direction of displaying liquid level indicators through pressure measurement, can solve problems such as equipment aging, reduced measurement accuracy, and inaccurate measurement accuracy, and achieve accurate measurement data, reduce errors, and ensure The effect of measurement accuracy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0038] Embodiment 1: as figure 1 As shown, a water level measurement method of a hydropower station is used to monitor the water level of a hydropower station. Two hydraulic sensors are placed at different depths under the liquid surface of a hydropower station. Environmental effects on two hydraulic sensors. The real-time depth information of different depths under the liquid surface of the hydropower station is collected through two hydraulic sensors A1 and A2. Preferably, the distance between the two hydraulic sensors is 1.5 meters, and other values greater than 1 meter and less than 2 meters are also acceptable, but the real distance must be measured accurately. The two hydraulic sensors can be connected together by a plastic hard strip to prevent the wave Floats under impact.
[0039] Calculate the real-time depth values M1 and M2 of the positions of the two hydraulic sensors A1 and A2 according to the real-time depth information collected by the two hydraulic senso...
Embodiment 2
[0049] Embodiment 2: as figure 1 As shown, a water level measurement method of a hydropower station is used to monitor the water level of a hydropower station. Two hydraulic sensors are placed at different depths under the liquid surface of a hydropower station. Environmental effects on two hydraulic sensors. The real-time depth information of different depths under the liquid surface of the hydropower station is collected through two hydraulic sensors A1 and A2. Preferably, the distance between the two hydraulic sensors is 1.5 meters, and other values greater than 1 meter and less than 2 meters are also acceptable, but the real distance must be measured accurately. The two hydraulic sensors can be connected together by a plastic hard strip to prevent the wave Floats under impact.
[0050] Calculate the real-time depth values M1 and M2 of the positions of the two hydraulic sensors A1 and A2 according to the real-time depth information collected by the two hydraulic senso...