Method of configuring physical resources for PBCH based on DM-RS demodulation
A DM-RS and physical resource block technology, applied in the field of DM-RS-based demodulation, can solve the problem of unavailable network assistance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0036] figure 1 It shows a manner of allocating physical resources for PBCH on physical resource block pairs in a communication environment based on a new independent carrier type according to an embodiment of the present invention. figure 2 It shows a manner of allocating resource elements used for PBCH on physical resource block pairs in a communication environment based on a new independent carrier type according to another embodiment of the present invention.
[0037] Here, PBCH transmission will still use the central 6 physical resource block pairs. exist figure 1 and figure 2 Proposed two ways of configuring resource elements of the new PBCH using different OFDM symbols in the subframe. However, the period of the PBCH is still the same as that of the traditional PBCH, and is mapped to the first subframe of each radio frame, and is repeated every 40 ms. In addition, the same as the traditional PBCH, in the frequency domain, the central 72 subcarriers (6 physical res...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


