Tunnel construction process safety evaluation method based on multi-element information early warning system
A technology for tunnel construction and early warning system, which is applied in special data processing applications, instruments, electrical digital data processing, etc. Actionable effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0037] combine figure 1 The method of the present invention is described as follows:
[0038] (1) Establish a tunnel construction safety evaluation index system;
[0039] (2) Establish a judgment matrix;
[0040] (3) Judgment matrix consistency check, if the consistency is not satisfied, then return to the previous step; if the consistency is satisfied, then enter the next step;
[0041] (4) Calculate the weight coefficient;
[0042] (5) Evaluate the safety status of tunnel construction in combination with multi-information early warning system.
[0043] The specific steps are:
[0044] (1) Establish an evaluation index system for tunnel construction risk
[0045] According to the main factors collected in the tunnel construction multi-information early warning system, 8 single factors are determined, and the safety evaluation of the tunnel construction status is carried out in three levels. The main factors are divided into three items: human factors C 1 , equipment fa...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com