In-put control method for standby powers of transformer substations
A backup power supply and control method technology, applied in the field of power grids, can solve the problems of limited substation bus connection types, inability to operate at the same time, inability to handle lines, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0018] The following will describe in detail the specific implementation of the backup power input control method of the substation according to the present invention in conjunction with the accompanying drawings.
[0019] The control method of the present invention treats the spare power line and the spare bus tie / section switch (representing the bus tie switch or the section switch) as a spare supply element respectively, and provides each element according to the pre-determined standby switching sequence Set a backup priority. When the bus loses voltage, select the backup components that can be switched after startup according to the priority order of the backup and switch them on to restore the power supply of the bus. When selected, it will be closed at the same time, not limited to the operation mode in the substation. According to the principle of "maximization", this method is designed with the substation of double-bus double-section wiring type as the model, and is su...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com