The Method of Changing the Excessive Throat Temperature Difference in Blast Furnace Smelting
A blast furnace smelting and furnace throat technology, which is applied in the field of changing the extremely large temperature difference of the blast furnace throat during blast furnace smelting, can solve the problems of increasing blast furnace production cost and long time consumption, and achieve the effect of reducing production cost and reducing recovery time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0022] Using 1750m 3 Vanadium-Titanium Magnetite was smelted in a large blast furnace, and the temperature of the throat of the furnace was detected by a hot spot couple. When the temperature of the throat of the furnace was seriously uneven and the extreme difference was large (the extreme difference was 600°C), the air volume was decisively reduced to 80% of the normal air volume. % (i.e. by 3800m 3 / min reduced to 3040m 3 / min), small high-pressure operation is adopted, the furnace top pressure is controlled at 160-165Kpa, the charging system is changed from 4 rings to 2 rings, and the ore batch weight and coke load are reduced to 90% of the normal time (that is, the ore batch weight is changed from 45t is reduced to 40.5t, the coke load is reduced from 4.7t / t to 4.23t / t), when the furnace throat temperature tends to be normal, start to add air, gradually increase the ore batch weight and coke load, and increase the charging system in time, Adopt high-pressure operation, ...
Embodiment 2
[0024] Use 2000m 3 Vanadium-Titanium Magnetite was smelted in a large blast furnace, and the temperature of the throat of the furnace was detected by a hot spot couple. When the temperature of the throat of the furnace was seriously uneven and the extreme difference was large (the extreme difference was 50°C), the air volume was decisively reduced to 80% of the normal air volume. % (ie by 4500m 3 / min reduced to 3600m 3 / min), adopt small high-pressure operation, the top pressure is controlled at 160-170Kpa, the charging system is changed from 4 rings to 2 ring charging, and the ore batch weight and coke load are reduced to 90% of the normal time (that is, the ore batch weight is changed from 56t is reduced to 50.4t, the coke load is reduced from 4.8t / t to 4.32t / t), when the furnace throat temperature tends to be normal, start to add air, gradually increase the ore batch weight and coke load, and increase the charging system in time, Adopt high-pressure operation, the furnac...
Embodiment 3
[0026] Use 2500m 3 Vanadium-Titanium Magnetite was smelted in a large blast furnace, and the temperature of the throat of the furnace was detected by a hot spot couple. When the temperature of the throat of the furnace was seriously uneven and the extreme difference was large (the extreme difference was 300°C), the air volume was decisively reduced to 90% of the normal air volume. % (i.e. by 5800m 3 / min reduced to 5220m 3 / min), adopt small high-pressure operation, the top pressure is controlled at 165-175Kpa, the charging system is changed from 4-ring to 2-ring charging, and the ore batch weight and coke load are reduced to 90% of the normal time (that is, the ore batch weight is changed from 68t is reduced to 61.2t, the coke load is reduced from 4.8t / t to 4.32t / t), when the furnace throat temperature tends to be normal, start to add air, gradually increase the ore batch weight and coke load, and increase the charging system in time, Adopt high-pressure operation, the furn...