The method of jacking construction of the bridge
A technology of jacking construction and jacking construction platforms, which is applied in the direction of bridges, bridge construction, erection/assembly of bridges, etc., and can solve the problem of increasing the maximum reaction force of the shifter and the platform, increasing the force, and not considering the front end of the main girder To ensure the quality of construction, wide applicability and construction safety
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0031] The present invention will be described in further detail below in conjunction with the accompanying drawings and specific embodiments.
[0032] refer to figure 2 , the method for the jacking construction of the bridge of the present invention can be applied in the construction of such as certain big bridge, and concrete construction procedure comprises the following steps:
[0033] (1) Set up a push construction platform 1;
[0034] The jacking construction platform 1 includes a load-bearing system 11 and a slide system 12 arranged above the load-bearing system 11 . Preferably, the slideway system 12 includes a slideway extending in the longitudinal direction of the pushing construction platform 1 arranged above the load-bearing system 11, a plurality of shifters whose moving tracks are defined by the slideways, And an adjustment device for adjusting the height and horizontal position of the shifter. More preferably, the slideway includes at least one main slideway...